At the center of the project, Coral Sul FLNG: a floating plant for the liquefaction of natural gas. The ship is 432 meters long and weighs 200 thousand tons. It also has a gas liquefaction capacity of 3.4 million tons per year and will produce LNG from the 500 billion cubic meters of gas from the Coral field. This historic project will help increase the availability of gas on the global market and is an important lever of Mozambique economic and social development.
Mellitah Plant – Upgrade of Let Down Station for Local Market Gas Supply
The project aims to replace the temporary Let Down Station, installed in 2015, with permanent pressure reduction facilities at the expansion area of GS. This upgrade is intended to transport gas to the local market and supply the existing Sirte Oil Company (SOC) coastal gas pipeline with an increased capacity of 19.5 MSm3/d of sales gas at a higher pressure of 51 Bar.
The Offshore Cape Three Points (OCTP) project is a comprehensive endeavor focused on developing oil and natural gas reserves, specifically to meet the energy needs of Sub-Saharan Africa. Positioned off Ghana’s western coast, OCTP operates subsea wells and systems linked to the John Agyekum Kufuor Floating Production Storage and Offloading (FPSO) unit. In 2020, OCTP contributed over half of Ghana’s gas supply for thermal power generation.