North Safa is an active conventional oil field situated in shallow waters off the coast of Egypt. Specifically located in the Northeast Ramadan Concession block, the field operates at a water depth of 217 feet. Anticipated to reach peak production by 2026, North Safa’s oil extraction will persist until it reaches its economic limit in 2041, as per economic projections.
Baltic Pipe Project – Compressor Station in Everdrup
The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark.
The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.
Mellitah Plant – Upgrade of Let Down Station for Local Market Gas Supply
The project aims to replace the temporary Let Down Station, installed in 2015, with permanent pressure reduction facilities at the expansion area of GS. This upgrade is intended to transport gas to the local market and supply the existing Sirte Oil Company (SOC) coastal gas pipeline with an increased capacity of 19.5 MSm3/d of sales gas at a higher pressure of 51 Bar.