Search

Medium & Low Voltage Electrical Cables

Spina Group manufactures and supplies industrial electrical cables for high risk of corrosion and explosion environments in the Oil & Gas, Petrochemical, Energy, Infrastructure, Telecommunications and Marine sectors.

The insulation materials used in the manufacturing and the thicknesses of the sheaths guarantee a high efficacy with respect to the propagation of flames and all cables are made in compliance with national and international standards (CEI, EN, IEC, BS, NF, VDE).

Cables are made according to the specifications provided by the customer. In the absence of specifications, the solutions provided are designed according to the customer’s real needs and based on accurate analysis of the areas of application.

Product tests and inspections are carried out in collaboration with the customer.

Our Offer

Instrument Cables and Thermocouples

Spina Group manufactures and supplies instrumental cables for transmission of analog (4…20mA) and digital signals, interconnection of measuring and process instruments, in safety areas and in augmented and intrinsically safe environments. We also manufactur and supply thermocouple cables TX, JX, EX, KX type to be used in all conditions and in every industrial plant. Production takes place on the basis of specific contracts and the cables are carefully tested to ensure maximum performance.

LV and MV Power Cables
Low Voltage (LV) and Medium Voltage (MV) cables are designed for the efficient transmission of electrical power and signals, performing reliably in both standard and demanding industrial environments. Engineered to meet rigorous safety and performance standards, these cables ensure consistent operation across a wide range of conditions.
Fire Performance Cables

High-quality fire performance cables are engineered to maintain functionality under extreme conditions, ensuring reliable signal transmission and power supply even during fire scenarios. Designed for critical applications, these cables support emergency systems, alarms, and essential communication networks. Featuring fire-resistant insulation and robust sheathing, they undergo rigorous testing to meet stringent international standards, offering durability and safety in high-temperature and high-risk environments. Ideal for industrial, commercial, and public facilities, these fire performance cables deliver resilience and compliance for maximum protection.

Latest successful projects

Oil&Gas

Ghana OCTP Development Project

The Offshore Cape Three Points (OCTP) project is a comprehensive endeavor focused on developing oil and natural gas reserves, specifically to meet the energy needs of Sub-Saharan Africa. Positioned off Ghana’s western coast, OCTP operates subsea wells and systems linked to the John Agyekum Kufuor Floating Production Storage and Offloading (FPSO) unit. In 2020, OCTP contributed over half of Ghana’s gas supply for thermal power generation.

Oil&Gas

Abu Attifel and NC 125 Conventional Oil Field

Located onshore Libya, the Abu Attifel and NC 125 fields are active in conventional oil production. Their peak production occurred in 1994, having already recovered 92.14% of their total recoverable reserves. Economic projections indicate that oil extraction will continue until these fields reach their economic limit by 2046. Presently, these fields contribute approximately 5% to Libya’s daily oil output.

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Need help?

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs

Download the catalogue

Download our PDF catalog to get all the detail information related to this product category