Search

Manifolds and Valves

Spina Group offers different types of pressure measuring instruments, including manifolds and valves suitable for static pressures, applications with liquids or for differential pressures, available for different types of installation and with different styles and designed to provide a safe and reliable method of measurement pressure and versatile towards installation within the process.

Typologies

Accessories

Among our manifolds and valves, you will find:

  • Bar stock manifolds

  • Monoflange manifolds

  • Distribution manifolds

  • Bar stock needle valves

  • Check valves

  • Ball valves

  • Compression ball valves

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Petrochemical

PDH – Kallo Project

The upcoming propane dehydrogenation (PDH) plant is set to be a major player, aiming for a production capacity of 750,000 metric tonnes per year, positioning it among the world’s largest and most efficient facilities. It is situated at an existing Borealis production site in Kallo, Belgium, chosen for its strategic logistical location and extensive experience in propylene production. Additionally, the selection aims to capitalize on synergies with the existing PDH unit. Utilizing Honeywell UOP’s Oleflex™ technology, known for its reliability and sustainability in propylene production, underscores the plant’s commitment to efficient and eco-friendly operations.

Petrochemical

Bouri Field

The Bouri Field is located offshore in Block NC-41, about 120km northwest of Tripoli in the waters of Libya. Water depth in the region ranges between 145m and 183m. Is estimated to contain 4.5 billion barrels (720,000,000 m3) in proven recoverable crude oil reserves and 3.5 trillion cubic feet (99 km3) of associated natural gas with an annual production potential of 6 billion m³. Bouri field development includes two offshore platforms- DP3 and DP4, seven subsea wells and an Floating Storage and Offloading (FSO). Bouri is considered the largest producing oilfield in the Mediterranean.

Oil&Gas

Baltic Pipe Project – Compressor Station in Everdrup

The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark. The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs