Search

Earthing Pits

Spina offers a wide selection of inspection sumps in anti-corrosive plastic, available with removable bottom, carriageable cover, suitable for cable and earthing connection.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Petrochemical

Liverpool Bay WP3

Liverpool Bay WP3 is part of the Liverpool Bay CCS project, developed by Eni in the United Kingdom to transport and permanently store CO₂ from the HyNet industrial cluster, which spans North West England and North Wales. The project aims to capture CO₂ emissions from hard-to-abate industries and permanently store them in depleted offshore gas fields beneath Liverpool Bay.

Oil&Gas

HRM Boosting Hassi R’Mel Phase III Step 2

HRM Boosting – Hassi R’Mel Phase III Step 2 is a capacity enhancement project for the Hassi R’Mel gas field, Algeria’s largest and one of the world’s biggest gas fields. Developed by SONATRACH, the project is designed to offset the natural decline in reservoir pressure and sustain the field’s production capacity over the long term.

Bioenergy

ENAP Chile — WSA and SWS Units

ENAP, Chile’s state-owned integrated oil and gas company, has implemented Wet Gas Sulfuric Acid (WSA) and Sour Water Stripping (SWS) units at its Bío Bío Refinery in Hualpén as part of its environmental upgrade program. These facilities are designed to reduce sulfur emissions, treat sour process water, and support compliance with Chile’s stringent environmental regulations while improving the refinery’s overall environmental performance.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs