Search

Equipotential Connections & Accessories

A wide selection of clamps, plates, turnband, bonding bars, terminal boards, bar insulators and bridge cables suitable for earthing stainless steel, copper and nickel-plated brass pipes.

Typologies

Accessories

Among our products, you will find:

  • Equipotential bonding flat bars

  • Equipotential bonding bars

  • Disconnection clamps

  • Bar insulators

  • Pipe collars

  • Flexible braids

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Petrochemical

Debottleneck SF5

Debottleneck SF5 is an engineering project by LyondellBasel to debottleneck the SF5 plant in Ferrara, Italy. The SF5 plant manufactures support materials for Ziegler–Natta catalysts, which are used in the production of polypropylene and other polyolefins. The objective of the project is to increase the plant’s production capacity from its existing level to approximately 1,750 tonnes per year, while keeping the facility ready for future expansion to 2,200 tonnes per year.

Energy

Turkistan CCGT Power Plant Project

The Turkistan CCGT Power Plant Project is a project located in the Turkistan Region, Kazakhstan, developed by PGU Turkestan LLP. The project involves the construction of a gas-fired combined cycle power plant with a capacity of approximately 1,000 MW, consisting of gas turbines, heat recovery steam generators and steam turbines. Its objective is to strengthen the electricity supply reliability of southern Kazakhstan, compensate for the shortage of power generation capacity and ensure greater stability for the national grid.

Petrochemical

Project CERES

The Ceres Urea Plant, located on the coast of Western Australia, is a large onshore facility for the production of ammonia and urea from natural gas. Once completed, it will be the world’s largest gas-based ammonia and urea production plant. It uses local natural gas to produce fertilizers, integrating ammonia production, urea production, granulation, auxiliary services, port infrastructure and water supply facilities. The plant will include production areas, storage facilities and administrative functions. A 3.2 km conveyor belt will connect the plant to the port for the transport and loading of urea intended for export. The facility is designed to contribute to the target of achieving net-zero carbon emissions by 2050.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs