Search

Surge Arresters

Overvoltage surge arresters (also called SPD – Surge Protection Device) are mechanisms that allow to protect electrical equipment from overvoltages by absorbing the generated current. They can also be inserted in an already existing system in order not to modify the operation of the system.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Hail & Ghasha Gas Development

Hail & Ghasha Gas Development is one of the world’s largest sour gas development projects. It includes the development of the offshore Hail, Ghasha, Dalma, Nasr, SARB, Bu Haseer, Shuweihat and Mubarraz fields, together with the construction of new offshore infrastructure and onshore gas processing facilities. The project is also designed to become the world’s first net-zero sour gas development. Package 2 (PKG-2) covers the construction of the onshore gas processing facilities. Its main scope includes sour gas processing plants, sulfur recovery and by-product handling units, compression systems, utilities and auxiliary infrastructure, as well as connections to the offshore installations and the UAE’s national gas network. The project aims to increase the United Arab Emirates’ natural gas production, support domestic energy self-sufficiency and boost exports, while reducing the carbon intensity of operations through the integration of Carbon Capture and Storage (CCS) technologies. Once completed, the development is expected to produce approximately 1.5–1.8 billion standard cubic feet of natural gas per day (bcf/d), in addition to condensate and sulfur, making a significant contribution to ADNOC’s long-term gas strategy.

Oil&Gas

Sakarya 2

The Sakarya Gas Field Development 2 is an offshore project located in the western Black Sea, approximately 165 km off the coast of Filyos, Türkiye. Developed by Turkish Petroleum Corporation, the project involves the expansion of the Sakarya Gas Field’s production capacity through new offshore wells, subsea infrastructure and pipelines for transporting gas to the onshore processing plant in the Filyos area. Its objective is to increase Türkiye’s domestic natural gas production, reduce the country’s dependence on imports and contribute to national energy security.

Bioenergy

Rotterdam Site Development Project

The production of renewable products began at the Rotterdam refinery in the Netherlands in 2011, marking a significant milestone in sustainability efforts. With Neste’s current capacity for renewable products standing at 1.4 million tons in Rotterdam, it currently holds the title for the largest such capacity in Europe. To further bolster its commitment to renewable energy, Neste is undertaking a substantial investment of approximately EUR 1.9 billion for the expansion of the Rotterdam refinery. This expansion project aims to increase overall renewable product capacity by 1.3 million tons per annum. Consequently, the total renewable product capacity in Rotterdam will soar to 2.7 million tons annually, with sustainable aviation fuel (SAF) production capability accounting for 1.2 million tons. The target timeline for starting up the new production unit is set for 2026.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs