Search

Surge Arresters

Overvoltage surge arresters (also called SPD – Surge Protection Device) are mechanisms that allow to protect electrical equipment from overvoltages by absorbing the generated current. They can also be inserted in an already existing system in order not to modify the operation of the system.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Petrochemical

Harvest — 3007 MTPD Blue Ammonia Plant

Project Harvest is a low-carbon blue ammonia production facility under development at the TA’ZIZ Industrial Chemicals Zone in Al Ruwais Industrial City, Abu Dhabi. Developed by Fertiglobe, the plant will produce approximately 1 million tonnes of ammonia per year (around 3,000 MTPD). The project aims to support the UAE’s energy transition by supplying low-carbon ammonia while integrating carbon capture technologies to reduce the carbon intensity of production.

Oil&Gas

Scarabeo 5

The Scarabeo 5 is a semi-submersible offshore unit belonging to Saipem, originally designed as a 4th-generation drilling floater for exploration and production activities in harsh and subarctic environments. In 2023, Saipem was awarded a contract by Eni Congo to convert the unit into a Floating Production Unit — FPU for the Congo LNG Project. Once installed offshore the Republic of Congo, northwest of the Djeno Terminal, the unit will separate gas and liquids and compress the gas to feed a nearby FLNG unit.

Petrochemical

Project CERES

The Ceres Urea Plant, located on the coast of Western Australia, is a large onshore facility for the production of ammonia and urea from natural gas. Once completed, it will be the world’s largest gas-based ammonia and urea production plant. It uses local natural gas to produce fertilizers, integrating ammonia production, urea production, granulation, auxiliary services, port infrastructure and water supply facilities. The plant will include production areas, storage facilities and administrative functions. A 3.2 km conveyor belt will connect the plant to the port for the transport and loading of urea intended for export. The facility is designed to contribute to the target of achieving net-zero carbon emissions by 2050.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs