Surge Arresters

Overvoltage surge arresters (also called SPD – Surge Protection Device) are mechanisms that allow to protect electrical equipment from overvoltages by absorbing the generated current. They can also be inserted in an already existing system in order not to modify the operation of the system.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Petrobrazi Refinery

Petrobrazi, boasting an annual refining capacity of 4.5 million tons/year of crude oil, stands as one of Romania’s foremost refineries. It serves as a pivotal hub where crude oil undergoes processing, resulting in a diverse array of high-value petroleum products, ranging from gasoline and diesel to LPG and aviation fuel. Presently, Petrobrazi operates at exemplary environmental and performance standards, capable of refining the entire equity crude oil production of OMV Petrom. In a strategic move towards sustainability, the Romanian oil company plans to construct 55MW of green hydrogen projects at its Petrobrazi refinery, located 60km north of Bucharest. This initiative involves the installation of two electrolysers, one with a capacity of 35MW and the other with 20MW. The renewable hydrogen generated will be utilized in the production of bio-based sustainable aviation fuel (SAF) and biodiesel, marking a significant step towards reducing carbon emissions in the aviation sector.

Oil&Gas

Baltic Pipe Project – Compressor Station in Everdrup

The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark. The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.

Oil&Gas

Coral North Project

Coral North is the second project for the development of the considerable gas resources discovered by Eni in Area 4 of the Rovuma Basin. The Floating Liquefied Natural Gas (FLNG) unit will have a capacity of around 3.5 MTPA (million tons for year). Managed by Eni and its partners, the project involves the deployment of a second Floating Liquefied Natural Gas (FLNG) facility to double the region’s LNG production, building on the success of the Coral South project.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs