Search

Fire Performance Cables

High-quality fire performance cables are engineered to maintain functionality under extreme conditions, ensuring reliable signal transmission and power supply even during fire scenarios. Designed for critical applications, these cables support emergency systems, alarms, and essential communication networks. Featuring fire-resistant insulation and robust sheathing, they undergo rigorous testing to meet stringent international standards, offering durability and safety in high-temperature and high-risk environments. Ideal for industrial, commercial, and public facilities, these fire performance cables deliver resilience and compliance for maximum protection.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Berri Oil Field Expansion

The Berri field, situated along the eastern coast of Saudi Arabia, is undergoing expansion through the Berri Increment Program (BIP) to increase its crude production capacity to 500,000 barrels per day (bpd). Initially discovered in 1964, the Berri field commenced crude oil production in 1970, with the Berri gas plant starting operations in 1977. Currently capable of producing 250,000 bpd of Arab Light crude, the field’s expansion program aims to double its crude production capacity through enhanced oil recovery techniques.

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Oil&Gas

Coral South Project

At the center of the project, Coral Sul FLNG: a floating plant for the liquefaction of natural gas. The ship is 432 meters long and weighs 200 thousand tons. It also has a gas liquefaction capacity of 3.4 million tons per year and will produce LNG from the 500 billion cubic meters of gas from the Coral field. This historic project will help increase the availability of gas on the global market and is an important lever of Mozambique economic and social development.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs