Search

Pots and Siphons

Spina Group offers a wide range of condensate separation barrels, air distribution and siphons, which are used for the treatment and distribution of the process fluid before it reaches the instrument.

The siphons are used on the steam measurement lines to prevent it from directly investing the instrument and also to guarantee good heat dissipation avoiding overheating of the pressure gauge.

Typologies

Accessories

  • Condensing and Seal Pot
  • Gauge Siphon

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Kaombo FPSO Project

An innovative ultra-deep-water offshore project, the Kaombo project in Block 32 aims to extract oil from six fields linked by 300km of pipelines to FPSO vessels. Operating at depths up to 1,950 meters, it utilizes advanced technology for its 658 million barrel reserves, with a production capacity of 230,000 b/d, making it Angola’s largest subsea well system. Through cutting-edge technology and engineering, it pushes the boundaries of traditional oil exploration, demonstrating Angola’s commitment to advancing its energy sector.

Oil&Gas

Modernización Refinería Talara

The “Modernización Refinería Talara” project involves the refurbishment and modernization of the Talara refinery located in Peru. The project seeks to achieve two key objectives: reducing sulfur content in diesel, gasoline, and LPG fuels to a maximum of 50 ppm and increasing the refinery’s crude processing capacity from 65,000 to 95,000 barrels per day (BPD), allowing for the processing of heavy crude and conversion of residual products into marketable ones.

Oil&Gas

Tortue Development Project – Phase 1

An offshore project based on gas production in deep waters up to 2 km off the maritime border between Mauritania and Senegal. It is currently the deepest offshore project in Africa. Planned in phases, the Greater Tortue Ahmeyim LNG project will produce up to 10 million tonnes of LNG per year (Mtpa). A new drilling called Greater Tortue Ahmeyim-1 was carried out to a total depth of 4,884 meters in the eastern part of the Greater Tortue area, discovering 30 meters of net gas in a high-quality Albian reservoir in July 2019. This new discovery indicates the potential to expand the capacity of the LNG project beyond 10 Mtpa in the future.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs