Search

Equipotential Connections & Accessories

A wide selection of clamps, plates, turnband, bonding bars, terminal boards, bar insulators and bridge cables suitable for earthing stainless steel, copper and nickel-plated brass pipes.

Typologies

Accessories

Among our products, you will find:

  • Equipotential bonding flat bars

  • Equipotential bonding bars

  • Disconnection clamps

  • Bar insulators

  • Pipe collars

  • Flexible braids

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Bioenergy

H2H Saltend

H2H Saltend is a low-carbon hydrogen production project led by Equinor and the anchor project of the Zero Carbon Humber initiative. Located at Saltend Chemicals Park near Hull, in northeast England, the facility will produce blue hydrogen from natural gas using carbon capture and storage (CCS) technology. The project is designed to supply low-carbon hydrogen to industrial users, helping to reduce CO₂ emissions by up to 900,000 tonnes per year while supporting the decarbonization of the Humber industrial cluster and the UK’s transition to a net-zero economy.

Oil&Gas

Habshan Project

Habshan 7 is a major gas processing expansion project within the Habshan Gas Processing Complex, located in Abu Dhabi, United Arab Emirates. Developed by ADNOC as Phase 3 of the Rich Gas Development (RGD) programme, the project involves the construction of a seventh gas processing train to increase processing capacity and recover greater volumes of high-value products, including LPG, naphtha and condensates.

Oil&Gas

Hail & Ghasha Gas Development

Hail & Ghasha Gas Development is one of the world’s largest sour gas development projects. It includes the development of the offshore Hail, Ghasha, Dalma, Nasr, SARB, Bu Haseer, Shuweihat and Mubarraz fields, together with the construction of new offshore infrastructure and onshore gas processing facilities. The project is also designed to become the world’s first net-zero sour gas development. Package 2 (PKG-2) covers the construction of the onshore gas processing facilities. Its main scope includes sour gas processing plants, sulfur recovery and by-product handling units, compression systems, utilities and auxiliary infrastructure, as well as connections to the offshore installations and the UAE’s national gas network. The project aims to increase the United Arab Emirates’ natural gas production, support domestic energy self-sufficiency and boost exports, while reducing the carbon intensity of operations through the integration of Carbon Capture and Storage (CCS) technologies. Once completed, the development is expected to produce approximately 1.5–1.8 billion standard cubic feet of natural gas per day (bcf/d), in addition to condensate and sulfur, making a significant contribution to ADNOC’s long-term gas strategy.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs