Search

Equipotential Connections & Accessories

A wide selection of clamps, plates, turnband, bonding bars, terminal boards, bar insulators and bridge cables suitable for earthing stainless steel, copper and nickel-plated brass pipes.

Typologies

Accessories

Among our products, you will find:

  • Equipotential bonding flat bars

  • Equipotential bonding bars

  • Disconnection clamps

  • Bar insulators

  • Pipe collars

  • Flexible braids

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Salina Cruz Refinery Delayed Coker Furnaces

PEMEX is investing in constructing two new coker plants at the Tula refinery and Salina Cruz refinery, scheduled to go online in 2024, to phase out fuel oil production. The Salina Cruz cracking refinery, located in Oaxaca, Mexico, is a non-integrated cracking facility owned by Petroleos Mexicanos. It commenced operations in 1979 and boasts a Nelson Complexity Index (NCI) of 8.1. Works on the Salina Cruz unit began in 2022. The plant is expected to contribute to the elimination of fuel oil and the increased production of ultra-low sulfur gasoline and diesel at the refinery.

Energy

Taweelah RO Independent Water Project

The world’s largest sea water reverse osmosis desalination plant (RO), boasting a capacity of 200 MIGD (909,200 cubic meters of water per day). This plant surpasses the world’s current largest RO facility by 44% in terms of capacity. The Taweelah plant is poised to establish new benchmarks for water production efficiency and cost, thanks to its utilization of RO technology instead of thermal desalination.

Oil&Gas

Berri Oil Field Expansion

The Berri field, situated along the eastern coast of Saudi Arabia, is undergoing expansion through the Berri Increment Program (BIP) to increase its crude production capacity to 500,000 barrels per day (bpd). Initially discovered in 1964, the Berri field commenced crude oil production in 1970, with the Berri gas plant starting operations in 1977. Currently capable of producing 250,000 bpd of Arab Light crude, the field’s expansion program aims to double its crude production capacity through enhanced oil recovery techniques.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs