Founded in 1962, the Marsa El-Brega Refinery is an oil refinery located in Marsa El-Brega, in eastern Libya, in the Ajdabiya area and overlooking the Gulf of Sirte. The plant is operated by Sirte Oil Company for Production, Manufacturing of Oil and Gas, a company active in the production and processing of oil and gas.
The Talimarjan Power Project is an energy project at the Talimarjan Thermal Power Plant, in Nuristan, Uzbekistan. The project involves the expansion and upgrade of the power plant through gas-fired Combined Cycle Gas Turbine — CCGT units, with the aim of increasing the country’s power generation efficiency, reliability and capacity. Originally developed under the CAREC/ADB framework and implemented by Talimarjan TPP, the project contributes to the modernization of Uzbekistan’s power sector and to national energy security.
The expansion of Western Desert Gas Complex (WDGC) is located in El-Amreya, Alexandria, Egypt. Once operational, the new Train D will increase WDGC’s production capacity to 1.5 bcfd, up from the current 950 MMcfd, with a capacity of 600 MMcfd. This expansion will not only boost the supply of ethane-propane mixture for Egyptian petrochemical producers but also increase WDGC’s production of LPG and condensates for the local market.