Búzios V (Búzios-5) Subsea Development Project is the fifth development phase of the Búzios pre-salt oil field, located in the Santos Basin offshore Rio de Janeiro, Brazil. Operated by Petrobras, the project involves the development of a subsea production system connecting 15 wells to the FPSO (Floating Production, Storage and Offloading) Almirante Barroso.
The world’s largest sea water reverse osmosis desalination plant (RO), boasting a capacity of 200 MIGD (909,200 cubic meters of water per day). This plant surpasses the world’s current largest RO facility by 44% in terms of capacity. The Taweelah plant is poised to establish new benchmarks for water production efficiency and cost, thanks to its utilization of RO technology instead of thermal desalination.
The CLOV Phase 3 Project is an offshore deepwater oil field development in Block 17, approximately 140 km off the Angolan coast. Operated by TotalEnergies, the project includes the installation of a four-well subsea production system connected to the existing CLOV floating production facility. The development is intended to increase oil output by approximately 30,000 barrels per day while maximizing the use of existing offshore infrastructure.