Heat Exchanger – Tube Bundle Maintenance

Specialized equipment for maintaining and servicing heat exchanger components. This includes robust systems for bundle extraction, lifting, and precise cleaning to ensure optimal heat exchanger performance. We also offer advanced tube-to-tubesheet orbital welding solutions, along with efficient tube insertion and pulling systems, all engineered to support precise, safe, and efficient maintenance in demanding industrial applications.

Typologies

Accessories

  • Bundle extraction and lifting

  • Bundle cleaning

  • Tube – tubesheet orbital welding

  • Tube insertion and pulling systems

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Luanda Refinery

The expansion and modernization initiative aims to significantly increase the refinery’s petrol production capacity, quadrupling it to 450 thousand tonnes per year. As a part of this project, the Combined Cycle has been revamped to utilize hydrogen generated by the new Platforming unit. Additionally, energy production has been optimized by recycling gas, resulting in a notable reduction in polluting emissions.

Petrochemical

Bouri Field

The Bouri Field is located offshore in Block NC-41, about 120km northwest of Tripoli in the waters of Libya. Water depth in the region ranges between 145m and 183m. Is estimated to contain 4.5 billion barrels (720,000,000 m3) in proven recoverable crude oil reserves and 3.5 trillion cubic feet (99 km3) of associated natural gas with an annual production potential of 6 billion m³. Bouri field development includes two offshore platforms- DP3 and DP4, seven subsea wells and an Floating Storage and Offloading (FSO). Bouri is considered the largest producing oilfield in the Mediterranean.

Oil&Gas

Western desert Gas Complex Train

The expansion of Western Desert Gas Complex (WDGC) is located in El-Amreya, Alexandria, Egypt. Once operational, the new Train D will increase WDGC’s production capacity to 1.5 bcfd, up from the current 950 MMcfd, with a capacity of 600 MMcfd. This expansion will not only boost the supply of ethane-propane mixture for Egyptian petrochemical producers but also increase WDGC’s production of LPG and condensates for the local market.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs