Search

Pots and Siphons

Spina Group offers a wide range of condensate separation barrels, air distribution and siphons, which are used for the treatment and distribution of the process fluid before it reaches the instrument.

The siphons are used on the steam measurement lines to prevent it from directly investing the instrument and also to guarantee good heat dissipation avoiding overheating of the pressure gauge.

Typologies

Accessories

  • Condensing and Seal Pot
  • Gauge Siphon

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

AIN TSILA GAS FIELD DEVELOPMENT

Ain Tsila is a gas condensate field situated in the Illizi Basin, Algeria, located within the Isarene permit in Blocks 228 and 229a. The Ain Tsila field boasts reserves amounting to 2.1 trillion cubic feet of sales gas, alongside 67 million barrels of condensate and 108 million barrels of liquefied petroleum gas (LPG). Discovered in 2009 through the successful drilling of the Ain Tsila-1 well, this gas condensate field garnered significant recognition, ranking as the ninth-largest discovery globally for that year. Spanning an extensive area exceeding 1,000 square kilometers, Ain Tsila represents a substantial addition to the energy landscape.

Oil&Gas

Holborn

HOLBORN Europa Raffinerie, located in Hamburg, is a successful oil refinery that supplies Hamburg and northern Germany with fuels and heating oil. It is a refinery with a processing capacity of around 105,000 barrels of crude per day, and an average throughput of 4.5 million tonnes per annum.

Oil&Gas

Hail & Ghasha Gas Development

Hail & Ghasha Gas Development is one of the world’s largest sour gas development projects. It includes the development of the offshore Hail, Ghasha, Dalma, Nasr, SARB, Bu Haseer, Shuweihat and Mubarraz fields, together with the construction of new offshore infrastructure and onshore gas processing facilities. The project is also designed to become the world’s first net-zero sour gas development. Package 2 (PKG-2) covers the construction of the onshore gas processing facilities. Its main scope includes sour gas processing plants, sulfur recovery and by-product handling units, compression systems, utilities and auxiliary infrastructure, as well as connections to the offshore installations and the UAE’s national gas network. The project aims to increase the United Arab Emirates’ natural gas production, support domestic energy self-sufficiency and boost exports, while reducing the carbon intensity of operations through the integration of Carbon Capture and Storage (CCS) technologies. Once completed, the development is expected to produce approximately 1.5–1.8 billion standard cubic feet of natural gas per day (bcf/d), in addition to condensate and sulfur, making a significant contribution to ADNOC’s long-term gas strategy.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs