Search

Perforated and Closed-Bottom Cable Trays

Cable trays are used in the industrial plants to protect the laid cables. Specifically, the PS and AR perforated series are characterized by more lightness and by a good ventilation of the cable inside. The typology FC (closed bottom) is particularly suitable for environments where the cable isolation is essential.

Thermal expansion: Our joints with crossed slots allow an even greater deviation between the elements, recovering any possible expansion without damages.

Electrical continuity: The electrical continuity of the cable trays is guaranteed by the correct assembly of joints and/or the copper bonding jumper; for this purpose, properly marked grounding holes are made on the cable trays and cable tray accessories.

Typologies

Accessories

Among our perforated and closed-bottom cable trays, you will find:

  • Perforated simple flanges

  • Perforated bordered flanges

  • Closed bottom bordered flanges

  • Elbows (plane, inward, outward)

  • T derivations

  • Cross Elements

  • Reductions

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Modernización Refinería Talara

The “Modernización Refinería Talara” project involves the refurbishment and modernization of the Talara refinery located in Peru. The project seeks to achieve two key objectives: reducing sulfur content in diesel, gasoline, and LPG fuels to a maximum of 50 ppm and increasing the refinery’s crude processing capacity from 65,000 to 95,000 barrels per day (BPD), allowing for the processing of heavy crude and conversion of residual products into marketable ones.
Alba Project

Petrochemical

ALBA Project – PP and PEL plants

The project consists of two plants: one for producing linear polyethylene (PEL) and another for producing polypropylene (PP), each with an annual production capacity of 300,000 tons. Both plants utilize cutting-edge technologies that ensure top energy efficiency. These technologies are leading in the market and are the first of their kind to be implemented on the Iberian Peninsula.

Oil&Gas

Mellitah Plant – Upgrade of Let Down Station for Local Market Gas Supply

The project aims to replace the temporary Let Down Station, installed in 2015, with permanent pressure reduction facilities at the expansion area of GS. This upgrade is intended to transport gas to the local market and supply the existing Sirte Oil Company (SOC) coastal gas pipeline with an increased capacity of 19.5 MSm3/d of sales gas at a higher pressure of 51 Bar.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs