Search

Control Panels

Spina Group specializes in the design, manufacturing, and installation of custom control panels for various industries, including oil & gas, chemical processing, construction, and more. We offer solutions for motor control, power distribution, automation, and process control, all designed to meet strict industry regulations. Our control panels are built to meet the highest technical standards, ensuring precision and reliability in each application.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Modernización Refinería Talara

The “Modernización Refinería Talara” project involves the refurbishment and modernization of the Talara refinery located in Peru. The project seeks to achieve two key objectives: reducing sulfur content in diesel, gasoline, and LPG fuels to a maximum of 50 ppm and increasing the refinery’s crude processing capacity from 65,000 to 95,000 barrels per day (BPD), allowing for the processing of heavy crude and conversion of residual products into marketable ones.

Petrochemical

Harvest — 3007 MTPD Blue Ammonia Plant

Project Harvest is a low-carbon blue ammonia production facility under development at the TA’ZIZ Industrial Chemicals Zone in Al Ruwais Industrial City, Abu Dhabi. Developed by Fertiglobe, the plant will produce approximately 1 million tonnes of ammonia per year (around 3,000 MTPD). The project aims to support the UAE’s energy transition by supplying low-carbon ammonia while integrating carbon capture technologies to reduce the carbon intensity of production.

Petrochemical

Project CERES

The Ceres Urea Plant, located on the coast of Western Australia, is a large onshore facility for the production of ammonia and urea from natural gas. Once completed, it will be the world’s largest gas-based ammonia and urea production plant. It uses local natural gas to produce fertilizers, integrating ammonia production, urea production, granulation, auxiliary services, port infrastructure and water supply facilities. The plant will include production areas, storage facilities and administrative functions. A 3.2 km conveyor belt will connect the plant to the port for the transport and loading of urea intended for export. The facility is designed to contribute to the target of achieving net-zero carbon emissions by 2050.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs