Search

Fixing and Accessories

Spina Group offers a complete range of cable tray accessories and fixing components designed to simplify installation and ensure maximum stability for electrical and instrumentation systems.

Our range includes cable ladder accessories, joints, and fixing brackets that guarantee safe and quick assembly for all cable tray types, from perforated to ladder and wire mesh.

Among our most requested solutions are cable tray joints and expansion joints, which allow flexibility and compensate for thermal expansion, maintaining the alignment and mechanical strength of the system even under temperature variations.

The accessory line also includes separators, end edges, wall supports, and floor fixings, available in Hot-Dip Galvanised (HDG), stainless steel, and aluminium to ensure compatibility with all Spina Group cable tray systems.

Every fixing accessory is engineered according to European standards, offering durability, corrosion resistance, and ease of installation — the ideal choice for industrial and infrastructure applications.

Typologies

Accessories

Among our fixing and accessories, you will find:

  • Fixings & joints

  • Separators

  • End Edges

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Baltic Pipe Project – Compressor Station in Everdrup

The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark. The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.

Oil&Gas

Abu Attifel and NC 125 Conventional Oil Field

Located onshore Libya, the Abu Attifel and NC 125 fields are active in conventional oil production. Their peak production occurred in 1994, having already recovered 92.14% of their total recoverable reserves. Economic projections indicate that oil extraction will continue until these fields reach their economic limit by 2046. Presently, these fields contribute approximately 5% to Libya’s daily oil output.

Oil&Gas

Assiut Hydrocracking Complex

The Assiut oil refinery in Egypt is undergoing a significant expansion and modernization effort to meet the rising demand for petroleum products in Upper Egypt. As part of the refinery upgrade, new facilities including a naphtha complex and a hydrocracking complex will be added. This expansion and modernization initiative will further boost the refining capacity of the existing refinery. Presently, the refinery processes 4.5 million tonnes per annum (Mtpa) of distillation crude.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs