Search

Fixing and Accessories

Spina Group offers a complete range of cable tray accessories and fixing components designed to simplify installation and ensure maximum stability for electrical and instrumentation systems.

Our range includes cable ladder accessories, joints, and fixing brackets that guarantee safe and quick assembly for all cable tray types, from perforated to ladder and wire mesh.

Among our most requested solutions are cable tray joints and expansion joints, which allow flexibility and compensate for thermal expansion, maintaining the alignment and mechanical strength of the system even under temperature variations.

The accessory line also includes separators, end edges, wall supports, and floor fixings, available in Hot-Dip Galvanised (HDG), stainless steel, and aluminium to ensure compatibility with all Spina Group cable tray systems.

Every fixing accessory is engineered according to European standards, offering durability, corrosion resistance, and ease of installation — the ideal choice for industrial and infrastructure applications.

Typologies

Accessories

Among our fixing and accessories, you will find:

  • Fixings & joints

  • Separators

  • End Edges

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Energy

Taweelah RO Independent Water Project

The world’s largest sea water reverse osmosis desalination plant (RO), boasting a capacity of 200 MIGD (909,200 cubic meters of water per day). This plant surpasses the world’s current largest RO facility by 44% in terms of capacity. The Taweelah plant is poised to establish new benchmarks for water production efficiency and cost, thanks to its utilization of RO technology instead of thermal desalination.

Oil&Gas

North Safa Field Development Project

North Safa is an active conventional oil field situated in shallow waters off the coast of Egypt. Specifically located in the Northeast Ramadan Concession block, the field operates at a water depth of 217 feet. Anticipated to reach peak production by 2026, North Safa’s oil extraction will persist until it reaches its economic limit in 2041, as per economic projections.

Energy

New Hydrogen Production Unit – Porto Marghera

The project aims at implementing two hydrogen production lines for the Venice biorefinery in Porto Marghera. Its primary objective is to increase the availability of hydrogen at the biorefinery to fulfill the requirements of the EcofiningTM unit in terms of quality, quantity, and availability, all while optimizing energy efficiency. As part of a phased transition to producing decarbonized hydrogen, these units are designed to significantly reduce the emission of fossil CO2 into the atmosphere by utilizing biogenic charges recirculated by the EcofiningTM unit.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs