Search

Fixing and Accessories

Spina Group offers a complete range of cable tray accessories and fixing components designed to simplify installation and ensure maximum stability for electrical and instrumentation systems.

Our range includes cable ladder accessories, joints, and fixing brackets that guarantee safe and quick assembly for all cable tray types, from perforated to ladder and wire mesh.

Among our most requested solutions are cable tray joints and expansion joints, which allow flexibility and compensate for thermal expansion, maintaining the alignment and mechanical strength of the system even under temperature variations.

The accessory line also includes separators, end edges, wall supports, and floor fixings, available in Hot-Dip Galvanised (HDG), stainless steel, and aluminium to ensure compatibility with all Spina Group cable tray systems.

Every fixing accessory is engineered according to European standards, offering durability, corrosion resistance, and ease of installation — the ideal choice for industrial and infrastructure applications.

Typologies

Accessories

Among our fixing and accessories, you will find:

  • Fixings & joints

  • Separators

  • End Edges

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Petrobrazi Refinery

Petrobrazi, boasting an annual refining capacity of 4.5 million tons/year of crude oil, stands as one of Romania’s foremost refineries. It serves as a pivotal hub where crude oil undergoes processing, resulting in a diverse array of high-value petroleum products, ranging from gasoline and diesel to LPG and aviation fuel. Presently, Petrobrazi operates at exemplary environmental and performance standards, capable of refining the entire equity crude oil production of OMV Petrom. In a strategic move towards sustainability, the Romanian oil company plans to construct 55MW of green hydrogen projects at its Petrobrazi refinery, located 60km north of Bucharest. This initiative involves the installation of two electrolysers, one with a capacity of 35MW and the other with 20MW. The renewable hydrogen generated will be utilized in the production of bio-based sustainable aviation fuel (SAF) and biodiesel, marking a significant step towards reducing carbon emissions in the aviation sector.

Oil&Gas

Berri Oil Field Expansion

The Berri field, situated along the eastern coast of Saudi Arabia, is undergoing expansion through the Berri Increment Program (BIP) to increase its crude production capacity to 500,000 barrels per day (bpd). Initially discovered in 1964, the Berri field commenced crude oil production in 1970, with the Berri gas plant starting operations in 1977. Currently capable of producing 250,000 bpd of Arab Light crude, the field’s expansion program aims to double its crude production capacity through enhanced oil recovery techniques.

Oil&Gas

NFE – North Field East – NFE LNG Project

A significant project aiming to extract and liquefy natural gas from Qatar’s North Field, one of the world’s largest natural gas reservoirs. The NFE project includes four new LNG trains, eight wellhead platforms, drilling 80 wells, and laying offshore pipelines. It enables the production of 32 million tons of LNG annually, along with ethane, condensate, LPG, and helium.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs