Search

Cable Tray Covers

Spina Group designs and supplies cable tray covers to ensure complete protection of electrical and instrumentation cables from external agents such as dust, humidity, and mechanical impacts.

Our protective covers for cable trays and ladder trays are designed for indoor and outdoor environments, guaranteeing long-term reliability even in harsh industrial conditions.

Each outdoor cable tray with cover offers effective shielding against rain and UV exposure while maintaining proper cable ventilation. The covers are compatible with all perforated, ladder, and closed-bottom tray systems from Spina Group.

We provide ladder cable tray covers and fixing systems that allow quick installation and secure coupling without deformation. Covers are available in Hot-Dip Galvanised (HDG), stainless steel, and aluminium, matching the same materials and finishes as our cable tray product lines.

Custom sizes and thicknesses are available upon request to meet specific project requirements and environmental protection classes.

Typologies

Accessories

Among our cable tray covers, you will find:

  • Plane covers

  • Flowing covers

  • Ventilated covers

Among accessories, you will find:

  • accessory

    Clamping system

  • accessory

    Omega security clamps

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Coral South Project

At the center of the project, Coral Sul FLNG: a floating plant for the liquefaction of natural gas. The ship is 432 meters long and weighs 200 thousand tons. It also has a gas liquefaction capacity of 3.4 million tons per year and will produce LNG from the 500 billion cubic meters of gas from the Coral field. This historic project will help increase the availability of gas on the global market and is an important lever of Mozambique economic and social development.

Oil&Gas

North Safa Field Development Project

North Safa is an active conventional oil field situated in shallow waters off the coast of Egypt. Specifically located in the Northeast Ramadan Concession block, the field operates at a water depth of 217 feet. Anticipated to reach peak production by 2026, North Safa’s oil extraction will persist until it reaches its economic limit in 2041, as per economic projections.

Oil&Gas

BAPCO Modernization Program

The Bapco Modernization Programme (BMP) is on track to become one of Bahrain’s most significant projects to date. Located on Bahrain’s Eastern coast, the project aims to expand the capacity of the existing Sitra oil refinery from 267,000 to 360,000 barrels per day (BPD). Additionally, it seeks to enhance energy efficiency, maximize the utilization of heavy crude oil components, diversify product offerings, and ensure compliance with environmental standards.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs