Search

Profiles

Spina Group designs and produces a complete range of cable tray profiles and mounting accessories engineered to ensure reliable, easy, and efficient installation of cable support systems.

Our profiles are compatible with all cable tray and cable ladder types, guaranteeing perfect alignment, stability, and load distribution. The system is suitable for both industrial and infrastructure environments where precision and durability are required.

Available in simple and double versions, with perforations on one or three sides, these mounting cable tray profiles allow flexible installation in multiple configurations. They can be combined with wire mesh cable tray supports, wall brackets, and standard Spina Group fixing accessories.

The range also includes closing caps and profile accessories designed for safe and clean terminations. All elements are available in Hot-Dip Galvanised (HDG), stainless steel, and aluminium, ensuring full resistance to corrosion and mechanical stress.

Our cable tray mounting solutions simplify assembly operations and ensure structural integrity across all Spina Group cable management systems.

Typologies

Accessories

Among our profiles, you will find:

  • Simple profile – Perforated on bottom side

  • Simple profile – Perforated on 3 sides

  • Double profile – Perforated on bottom side

  • Double profile – Perforated on 3 sides

  • Closing caps

  • Accessories for profile mounting

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Kaminho FPSO Project

The Kaminho FPSO Project is the development of the offshore Cameia and Golfinho oil fields, located in Block 20/11 of the Kwanza Basin, offshore Angola. It is the first large-scale deepwater development in the Kwanza Basin. The project aims to develop the Cameia and Golfinho fields through a new FPSO connected to a subsea production system.

Oil&Gas

Mellitah Plant – Upgrade of Let Down Station for Local Market Gas Supply

The project aims to replace the temporary Let Down Station, installed in 2015, with permanent pressure reduction facilities at the expansion area of GS. This upgrade is intended to transport gas to the local market and supply the existing Sirte Oil Company (SOC) coastal gas pipeline with an increased capacity of 19.5 MSm3/d of sales gas at a higher pressure of 51 Bar.

Naval

CMA CGM SCRUBBER PROJECT

The project involves fitting scrubbers onto container ships totaling a capacity of 8.09 million TEU. This initiative aims to comply with a new regulation enforced by the International Maritime Organization (IMO) since January 1st, 2020, which mandates an 85% reduction in sulfur emissions from shipping companies. The goal is to mitigate the sector’s environmental impact and enhance air quality. Scrubbers offer an effective solution for controlling emissions from large vessels by filtering exhaust gases produced during fuel combustion, thereby reducing pollution.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs