Search

Profiles

Spina Group designs and produces a complete range of cable tray profiles and mounting accessories engineered to ensure reliable, easy, and efficient installation of cable support systems.

Our profiles are compatible with all cable tray and cable ladder types, guaranteeing perfect alignment, stability, and load distribution. The system is suitable for both industrial and infrastructure environments where precision and durability are required.

Available in simple and double versions, with perforations on one or three sides, these mounting cable tray profiles allow flexible installation in multiple configurations. They can be combined with wire mesh cable tray supports, wall brackets, and standard Spina Group fixing accessories.

The range also includes closing caps and profile accessories designed for safe and clean terminations. All elements are available in Hot-Dip Galvanised (HDG), stainless steel, and aluminium, ensuring full resistance to corrosion and mechanical stress.

Our cable tray mounting solutions simplify assembly operations and ensure structural integrity across all Spina Group cable management systems.

Typologies

Accessories

Among our profiles, you will find:

  • Simple profile – Perforated on bottom side

  • Simple profile – Perforated on 3 sides

  • Double profile – Perforated on bottom side

  • Double profile – Perforated on 3 sides

  • Closing caps

  • Accessories for profile mounting

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

JGTP Capacity Enhancement Project

The JGTP Capacity Enhancement Project is an expansion and upgrading project for the Jordan Gas Transmission Pipeline, aimed at increasing transmission capacity to meet growing domestic demand and support regional gas trade. The project includes pipeline upgrades and the addition of compressor facilities to allow the system to operate at higher pressures and transport larger gas volumes. The Jordan Gas Transmission Pipeline has a 36-inch (914 mm) diameter and an ultimate transmission capacity of approximately 10 billion cubic metres (bcm) of natural gas per year.

Oil&Gas

NFPS Offshore Compression Complexes Project (COMP2)

The NFPS Offshore Compression Complexes Project — COMP2 is an offshore project developed for QatarEnergy LNG in the North Field, off the north-eastern coast of Qatar. The project involves the construction of the first two offshore compression complexes, CP6S and CP7S, including compression platforms, living quarters, jacket structures, interconnecting bridges, flare platforms and auxiliary systems.

Petrochemical

Bouri Field

The Bouri Field is located offshore in Block NC-41, about 120km northwest of Tripoli in the waters of Libya. Water depth in the region ranges between 145m and 183m. Is estimated to contain 4.5 billion barrels (720,000,000 m3) in proven recoverable crude oil reserves and 3.5 trillion cubic feet (99 km3) of associated natural gas with an annual production potential of 6 billion m³. Bouri field development includes two offshore platforms- DP3 and DP4, seven subsea wells and an Floating Storage and Offloading (FSO). Bouri is considered the largest producing oilfield in the Mediterranean.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs