Search

Profiles

Spina Group designs and produces a complete range of cable tray profiles and mounting accessories engineered to ensure reliable, easy, and efficient installation of cable support systems.

Our profiles are compatible with all cable tray and cable ladder types, guaranteeing perfect alignment, stability, and load distribution. The system is suitable for both industrial and infrastructure environments where precision and durability are required.

Available in simple and double versions, with perforations on one or three sides, these mounting cable tray profiles allow flexible installation in multiple configurations. They can be combined with wire mesh cable tray supports, wall brackets, and standard Spina Group fixing accessories.

The range also includes closing caps and profile accessories designed for safe and clean terminations. All elements are available in Hot-Dip Galvanised (HDG), stainless steel, and aluminium, ensuring full resistance to corrosion and mechanical stress.

Our cable tray mounting solutions simplify assembly operations and ensure structural integrity across all Spina Group cable management systems.

Typologies

Accessories

Among our profiles, you will find:

  • Simple profile – Perforated on bottom side

  • Simple profile – Perforated on 3 sides

  • Double profile – Perforated on bottom side

  • Double profile – Perforated on 3 sides

  • Closing caps

  • Accessories for profile mounting

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Elephant Field

The Elephant Field (also known as El Feel Field) is an onshore oil field located in Libya’s Murzuq Basin. Operated by Agip Oil Company, a joint venture between NOC and Eni, the field was discovered in 1997 and started production in 2004.

Oil&Gas

Castorone

Castorone, located in the Black sea, the is one of the world’s largest and most technologically advanced pipelay vessels. Operating in S-lay configuration, it is capable of installing pipelines up to 60 inches in diameter in environments ranging from shallow waters to ultra-deepwater. Equipped with a DP3 dynamic positioning system, an advanced automated welding line, and a high-capacity pipelay system, Castorone delivers high production rates, precision, and reliability for complex offshore pipeline installation projects.

Energy

New Hydrogen Production Unit – Porto Marghera

The project aims at implementing two hydrogen production lines for the Venice biorefinery in Porto Marghera. Its primary objective is to increase the availability of hydrogen at the biorefinery to fulfill the requirements of the EcofiningTM unit in terms of quality, quantity, and availability, all while optimizing energy efficiency. As part of a phased transition to producing decarbonized hydrogen, these units are designed to significantly reduce the emission of fossil CO2 into the atmosphere by utilizing biogenic charges recirculated by the EcofiningTM unit.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs