Search

Bare & Insulated Conductors

Tools for electrical connections, electromechanical applications, transformer rooms compliant with national and foreign regulations. Sections and shaping different from the standard can be supplied on request. The products comply with the main national and international standards and with specific customer requests.

Typologies

Accessories

Among our conductors, you will find:

  • Steel straps

  • Round conductors

  • Conductor ropes

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Petrochemical

PDH – Kallo Project

The upcoming propane dehydrogenation (PDH) plant is set to be a major player, aiming for a production capacity of 750,000 metric tonnes per year, positioning it among the world’s largest and most efficient facilities. It is situated at an existing Borealis production site in Kallo, Belgium, chosen for its strategic logistical location and extensive experience in propylene production. Additionally, the selection aims to capitalize on synergies with the existing PDH unit. Utilizing Honeywell UOP’s Oleflex™ technology, known for its reliability and sustainability in propylene production, underscores the plant’s commitment to efficient and eco-friendly operations.

Oil&Gas

Luanda Refinery

The expansion and modernization initiative aims to significantly increase the refinery’s petrol production capacity, quadrupling it to 450 thousand tonnes per year. As a part of this project, the Combined Cycle has been revamped to utilize hydrogen generated by the new Platforming unit. Additionally, energy production has been optimized by recycling gas, resulting in a notable reduction in polluting emissions.

Oil&Gas

North Safa Field Development Project

North Safa is an active conventional oil field situated in shallow waters off the coast of Egypt. Specifically located in the Northeast Ramadan Concession block, the field operates at a water depth of 217 feet. Anticipated to reach peak production by 2026, North Safa’s oil extraction will persist until it reaches its economic limit in 2041, as per economic projections.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs