Search

LV and MV Power Cables

Low Voltage (LV) and Medium Voltage (MV) cables are designed for the efficient transmission of electrical power and signals, performing reliably in both standard and demanding industrial environments. Engineered to meet rigorous safety and performance standards, these cables ensure consistent operation across a wide range of conditions.

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

AIN TSILA GAS FIELD DEVELOPMENT

Ain Tsila is a gas condensate field situated in the Illizi Basin, Algeria, located within the Isarene permit in Blocks 228 and 229a. The Ain Tsila field boasts reserves amounting to 2.1 trillion cubic feet of sales gas, alongside 67 million barrels of condensate and 108 million barrels of liquefied petroleum gas (LPG). Discovered in 2009 through the successful drilling of the Ain Tsila-1 well, this gas condensate field garnered significant recognition, ranking as the ninth-largest discovery globally for that year. Spanning an extensive area exceeding 1,000 square kilometers, Ain Tsila represents a substantial addition to the energy landscape.

Bioenergy

Rotterdam Site Development Project

The production of renewable products began at the Rotterdam refinery in the Netherlands in 2011, marking a significant milestone in sustainability efforts. With Neste’s current capacity for renewable products standing at 1.4 million tons in Rotterdam, it currently holds the title for the largest such capacity in Europe. To further bolster its commitment to renewable energy, Neste is undertaking a substantial investment of approximately EUR 1.9 billion for the expansion of the Rotterdam refinery. This expansion project aims to increase overall renewable product capacity by 1.3 million tons per annum. Consequently, the total renewable product capacity in Rotterdam will soar to 2.7 million tons annually, with sustainable aviation fuel (SAF) production capability accounting for 1.2 million tons. The target timeline for starting up the new production unit is set for 2026.

Oil&Gas

Revamp of the Fluid Catalytic Cracking Unit

The project involves upgrading the Reactor and Regenerator sections of the FCC Unit at Lukoil’s refinery in Bulgaria. This upgrade will boost the unit’s efficiency, enabling it to process more oil and produce higher-quality products. Additionally, it sets the stage for Lukoil’s future investments in the refinery, positioning the company for long-term success in the industry.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs