Search

Fixing and Accessories

Spina Group offers a complete range of cable tray accessories and fixing components designed to simplify installation and ensure maximum stability for electrical and instrumentation systems.

Our range includes cable ladder accessories, joints, and fixing brackets that guarantee safe and quick assembly for all cable tray types, from perforated to ladder and wire mesh.

Among our most requested solutions are cable tray joints and expansion joints, which allow flexibility and compensate for thermal expansion, maintaining the alignment and mechanical strength of the system even under temperature variations.

The accessory line also includes separators, end edges, wall supports, and floor fixings, available in Hot-Dip Galvanised (HDG), stainless steel, and aluminium to ensure compatibility with all Spina Group cable tray systems.

Every fixing accessory is engineered according to European standards, offering durability, corrosion resistance, and ease of installation — the ideal choice for industrial and infrastructure applications.

Typologies

Accessories

Among our fixing and accessories, you will find:

  • Fixings & joints

  • Separators

  • End Edges

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Salina Cruz Refinery Delayed Coker Furnaces

PEMEX is investing in constructing two new coker plants at the Tula refinery and Salina Cruz refinery, scheduled to go online in 2024, to phase out fuel oil production. The Salina Cruz cracking refinery, located in Oaxaca, Mexico, is a non-integrated cracking facility owned by Petroleos Mexicanos. It commenced operations in 1979 and boasts a Nelson Complexity Index (NCI) of 8.1. Works on the Salina Cruz unit began in 2022. The plant is expected to contribute to the elimination of fuel oil and the increased production of ultra-low sulfur gasoline and diesel at the refinery.

Oil&Gas

North Safa Field Development Project

North Safa is an active conventional oil field situated in shallow waters off the coast of Egypt. Specifically located in the Northeast Ramadan Concession block, the field operates at a water depth of 217 feet. Anticipated to reach peak production by 2026, North Safa’s oil extraction will persist until it reaches its economic limit in 2041, as per economic projections.

Naval

CMA CGM SCRUBBER PROJECT

The project involves fitting scrubbers onto container ships totaling a capacity of 8.09 million TEU. This initiative aims to comply with a new regulation enforced by the International Maritime Organization (IMO) since January 1st, 2020, which mandates an 85% reduction in sulfur emissions from shipping companies. The goal is to mitigate the sector’s environmental impact and enhance air quality. Scrubbers offer an effective solution for controlling emissions from large vessels by filtering exhaust gases produced during fuel combustion, thereby reducing pollution.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs