The expansion of Western Desert Gas Complex (WDGC) is located in El-Amreya, Alexandria, Egypt. Once operational, the new Train D will increase WDGC’s production capacity to 1.5 bcfd, up from the current 950 MMcfd, with a capacity of 600 MMcfd. This expansion will not only boost the supply of ethane-propane mixture for Egyptian petrochemical producers but also increase WDGC’s production of LPG and condensates for the local market.
The expansion and modernization initiative aims to significantly increase the refinery’s petrol production capacity, quadrupling it to 450 thousand tonnes per year. As a part of this project, the Combined Cycle has been revamped to utilize hydrogen generated by the new Platforming unit. Additionally, energy production has been optimized by recycling gas, resulting in a notable reduction in polluting emissions.
Baltic Pipe Project – Compressor Station in Everdrup
The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark.
The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.