At the center of the project, Coral Sul FLNG: a floating plant for the liquefaction of natural gas. The ship is 432 meters long and weighs 200 thousand tons. It also has a gas liquefaction capacity of 3.4 million tons per year and will produce LNG from the 500 billion cubic meters of gas from the Coral field. This historic project will help increase the availability of gas on the global market and is an important lever of Mozambique economic and social development.
Mellitah Plant – Upgrade of Let Down Station for Local Market Gas Supply
The project aims to replace the temporary Let Down Station, installed in 2015, with permanent pressure reduction facilities at the expansion area of GS. This upgrade is intended to transport gas to the local market and supply the existing Sirte Oil Company (SOC) coastal gas pipeline with an increased capacity of 19.5 MSm3/d of sales gas at a higher pressure of 51 Bar.
The project consists of two plants: one for producing linear polyethylene (PEL) and another for producing polypropylene (PP), each with an annual production capacity of 300,000 tons.
Both plants utilize cutting-edge technologies that ensure top energy efficiency. These technologies are leading in the market and are the first of their kind to be implemented on the Iberian Peninsula.