Search

Profiles

Spina Group designs and produces a complete range of cable tray profiles and mounting accessories engineered to ensure reliable, easy, and efficient installation of cable support systems.

Our profiles are compatible with all cable tray and cable ladder types, guaranteeing perfect alignment, stability, and load distribution. The system is suitable for both industrial and infrastructure environments where precision and durability are required.

Available in simple and double versions, with perforations on one or three sides, these mounting cable tray profiles allow flexible installation in multiple configurations. They can be combined with wire mesh cable tray supports, wall brackets, and standard Spina Group fixing accessories.

The range also includes closing caps and profile accessories designed for safe and clean terminations. All elements are available in Hot-Dip Galvanised (HDG), stainless steel, and aluminium, ensuring full resistance to corrosion and mechanical stress.

Our cable tray mounting solutions simplify assembly operations and ensure structural integrity across all Spina Group cable management systems.

Typologies

Accessories

Among our profiles, you will find:

  • Simple profile – Perforated on bottom side

  • Simple profile – Perforated on 3 sides

  • Double profile – Perforated on bottom side

  • Double profile – Perforated on 3 sides

  • Closing caps

  • Accessories for profile mounting

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Revamp of the Fluid Catalytic Cracking Unit

The project involves upgrading the Reactor and Regenerator sections of the FCC Unit at Lukoil’s refinery in Bulgaria. This upgrade will boost the unit’s efficiency, enabling it to process more oil and produce higher-quality products. Additionally, it sets the stage for Lukoil’s future investments in the refinery, positioning the company for long-term success in the industry.

Oil&Gas

Abu Attifel and NC 125 Conventional Oil Field

Located onshore Libya, the Abu Attifel and NC 125 fields are active in conventional oil production. Their peak production occurred in 1994, having already recovered 92.14% of their total recoverable reserves. Economic projections indicate that oil extraction will continue until these fields reach their economic limit by 2046. Presently, these fields contribute approximately 5% to Libya’s daily oil output.

Oil&Gas

Baltic Pipe Project – Compressor Station in Everdrup

The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark. The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs