Search

Profiles

Spina Group designs and produces a complete range of cable tray profiles and mounting accessories engineered to ensure reliable, easy, and efficient installation of cable support systems.

Our profiles are compatible with all cable tray and cable ladder types, guaranteeing perfect alignment, stability, and load distribution. The system is suitable for both industrial and infrastructure environments where precision and durability are required.

Available in simple and double versions, with perforations on one or three sides, these mounting cable tray profiles allow flexible installation in multiple configurations. They can be combined with wire mesh cable tray supports, wall brackets, and standard Spina Group fixing accessories.

The range also includes closing caps and profile accessories designed for safe and clean terminations. All elements are available in Hot-Dip Galvanised (HDG), stainless steel, and aluminium, ensuring full resistance to corrosion and mechanical stress.

Our cable tray mounting solutions simplify assembly operations and ensure structural integrity across all Spina Group cable management systems.

Typologies

Accessories

Among our profiles, you will find:

  • Simple profile – Perforated on bottom side

  • Simple profile – Perforated on 3 sides

  • Double profile – Perforated on bottom side

  • Double profile – Perforated on 3 sides

  • Closing caps

  • Accessories for profile mounting

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

CLOV Phase 3 Project

The CLOV Phase 3 Project is an offshore deepwater oil field development in Block 17, approximately 140 km off the Angolan coast. Operated by TotalEnergies, the project includes the installation of a four-well subsea production system connected to the existing CLOV floating production facility. The development is intended to increase oil output by approximately 30,000 barrels per day while maximizing the use of existing offshore infrastructure.
Alba Project

Petrochemical

ALBA Project – PP and PEL plants

The project consists of two plants: one for producing linear polyethylene (PEL) and another for producing polypropylene (PP), each with an annual production capacity of 300,000 tons. Both plants utilize cutting-edge technologies that ensure top energy efficiency. These technologies are leading in the market and are the first of their kind to be implemented on the Iberian Peninsula.

Energy

Turkistan CCGT Power Plant Project

The Turkistan CCGT Power Plant Project is a project located in the Turkistan Region, Kazakhstan, developed by PGU Turkestan LLP. The project involves the construction of a gas-fired combined cycle power plant with a capacity of approximately 1,000 MW, consisting of gas turbines, heat recovery steam generators and steam turbines. Its objective is to strengthen the electricity supply reliability of southern Kazakhstan, compensate for the shortage of power generation capacity and ensure greater stability for the national grid.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs