Search

Profiles

An extensive range of profiles designed to ensure easy, practical, and efficient installation of cable tray systems.

Typologies

Accessories

Among our profiles, you will find:

  • Simple profile – Perforated on bottom side

  • Simple profile – Perforated on 3 sides

  • Double profile – Perforated on bottom side

  • Double profile – Perforated on 3 sides

  • Closing caps

  • Accessories for profile mounting

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

BAPCO Modernization Program

The Bapco Modernization Programme (BMP) is on track to become one of Bahrain’s most significant projects to date. Located on Bahrain’s Eastern coast, the project aims to expand the capacity of the existing Sitra oil refinery from 267,000 to 360,000 barrels per day (BPD). Additionally, it seeks to enhance energy efficiency, maximize the utilization of heavy crude oil components, diversify product offerings, and ensure compliance with environmental standards.

Naval

CMA CGM SCRUBBER PROJECT

The project involves fitting scrubbers onto container ships totaling a capacity of 8.09 million TEU. This initiative aims to comply with a new regulation enforced by the International Maritime Organization (IMO) since January 1st, 2020, which mandates an 85% reduction in sulfur emissions from shipping companies. The goal is to mitigate the sector’s environmental impact and enhance air quality. Scrubbers offer an effective solution for controlling emissions from large vessels by filtering exhaust gases produced during fuel combustion, thereby reducing pollution.

Oil&Gas

Berri Oil Field Expansion

The Berri field, situated along the eastern coast of Saudi Arabia, is undergoing expansion through the Berri Increment Program (BIP) to increase its crude production capacity to 500,000 barrels per day (bpd). Initially discovered in 1964, the Berri field commenced crude oil production in 1970, with the Berri gas plant starting operations in 1977. Currently capable of producing 250,000 bpd of Arab Light crude, the field’s expansion program aims to double its crude production capacity through enhanced oil recovery techniques.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs