Search

Profiles

Spina Group designs and produces a complete range of cable tray profiles and mounting accessories engineered to ensure reliable, easy, and efficient installation of cable support systems.

Our profiles are compatible with all cable tray and cable ladder types, guaranteeing perfect alignment, stability, and load distribution. The system is suitable for both industrial and infrastructure environments where precision and durability are required.

Available in simple and double versions, with perforations on one or three sides, these mounting cable tray profiles allow flexible installation in multiple configurations. They can be combined with wire mesh cable tray supports, wall brackets, and standard Spina Group fixing accessories.

The range also includes closing caps and profile accessories designed for safe and clean terminations. All elements are available in Hot-Dip Galvanised (HDG), stainless steel, and aluminium, ensuring full resistance to corrosion and mechanical stress.

Our cable tray mounting solutions simplify assembly operations and ensure structural integrity across all Spina Group cable management systems.

Typologies

Accessories

Among our profiles, you will find:

  • Simple profile – Perforated on bottom side

  • Simple profile – Perforated on 3 sides

  • Double profile – Perforated on bottom side

  • Double profile – Perforated on 3 sides

  • Closing caps

  • Accessories for profile mounting

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Tortue Development Project – Phase 1

An offshore project based on gas production in deep waters up to 2 km off the maritime border between Mauritania and Senegal. It is currently the deepest offshore project in Africa. Planned in phases, the Greater Tortue Ahmeyim LNG project will produce up to 10 million tonnes of LNG per year (Mtpa). A new drilling called Greater Tortue Ahmeyim-1 was carried out to a total depth of 4,884 meters in the eastern part of the Greater Tortue area, discovering 30 meters of net gas in a high-quality Albian reservoir in July 2019. This new discovery indicates the potential to expand the capacity of the LNG project beyond 10 Mtpa in the future.

Oil&Gas

Luanda Refinery

The expansion and modernization initiative aims to significantly increase the refinery’s petrol production capacity, quadrupling it to 450 thousand tonnes per year. As a part of this project, the Combined Cycle has been revamped to utilize hydrogen generated by the new Platforming unit. Additionally, energy production has been optimized by recycling gas, resulting in a notable reduction in polluting emissions.

Oil&Gas

Salina Cruz Refinery Delayed Coker Furnaces

PEMEX is investing in constructing two new coker plants at the Tula refinery and Salina Cruz refinery, scheduled to go online in 2024, to phase out fuel oil production. The Salina Cruz cracking refinery, located in Oaxaca, Mexico, is a non-integrated cracking facility owned by Petroleos Mexicanos. It commenced operations in 1979 and boasts a Nelson Complexity Index (NCI) of 8.1. Works on the Salina Cruz unit began in 2022. The plant is expected to contribute to the elimination of fuel oil and the increased production of ultra-low sulfur gasoline and diesel at the refinery.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs