Search

Laboratories

Design, supply, and installation of turn-key laboratories for the analysis of chemical, metallurgical, and physical properties in the oil & gas, chemicals, and power generation sectors.

Our solutions are based on the study of individual project specifications, analytical methods, and available spaces to identify the best solution in terms of instrumentation and analyzers, technical furniture, fume cupboards and air treatment systems, utilities and technical gases distribution systems, hardware and software upgrades for existing laboratories, as well as chemicals and reagents.

Our Offer

Instrumentation & Analyzers

Our solutions are based on the study of individual project specifications with related analytical methods and available spaces in order to identify the best solution.

Gas Distribution System
  • Routing design & calculation based on
    available spaces and forecast number of
    machines
  • Consumption calculation
  • Supply of all the components including
    cylinder racks, change-overs.
  • Installation including tubing welded through
    orbital welding machines
Fume & Air Treatment System

The ducted fume hoods as they are the most used fume hoods available on the market today. The available type are the constant air volume (CAV), the reduced air volume (RAV) and the variable air volume (VAV) chemical fume hoods.

Chemical fume hoods work by extracting air and noxious fumes away from the lab. and out of the fume hood where the air is filtered and returned to the outside environment by means of a duct system. User protection is enhanced by a movable sash that can be raised or lowered based on the needs of the user. All three types work in a very similar way, differentiated only by their air flow properties.

Furniture

Availability of an almost infinite series of combinations of structure & working surface materials, module dimensions & internal configuration, tops & shelves that allow laboratory’s operators to work safely and with everything at their fingertips. All our solutions are entirely designed by our team of specialists which is also able to follow all the assembling activities at site.

Container & Custom-Made Shelters

Thanks to our engineering skills and to the manufacturing capability of our partners worldwide, we are able to supply tailored laboratory shelters either based on commercial container sizes (e.g. 20ft / 40ft) or specifically designed with tailored dimensions in order to suit any particular application need in term of construction materials, design and certifications required for installation in the most severe conditions, like those on vessels or offshore platforms.

Latest successful projects

Oil&Gas

BAPCO Modernization Program

The Bapco Modernization Programme (BMP) is on track to become one of Bahrain’s most significant projects to date. Located on Bahrain’s Eastern coast, the project aims to expand the capacity of the existing Sitra oil refinery from 267,000 to 360,000 barrels per day (BPD). Additionally, it seeks to enhance energy efficiency, maximize the utilization of heavy crude oil components, diversify product offerings, and ensure compliance with environmental standards.

Petrochemical

Bouri Field

The Bouri Field is located offshore in Block NC-41, about 120km northwest of Tripoli in the waters of Libya. Water depth in the region ranges between 145m and 183m. Is estimated to contain 4.5 billion barrels (720,000,000 m3) in proven recoverable crude oil reserves and 3.5 trillion cubic feet (99 km3) of associated natural gas with an annual production potential of 6 billion m³. Bouri field development includes two offshore platforms- DP3 and DP4, seven subsea wells and an Floating Storage and Offloading (FSO). Bouri is considered the largest producing oilfield in the Mediterranean.

Oil&Gas

Berri Oil Field Expansion

The Berri field, situated along the eastern coast of Saudi Arabia, is undergoing expansion through the Berri Increment Program (BIP) to increase its crude production capacity to 500,000 barrels per day (bpd). Initially discovered in 1964, the Berri field commenced crude oil production in 1970, with the Berri gas plant starting operations in 1977. Currently capable of producing 250,000 bpd of Arab Light crude, the field’s expansion program aims to double its crude production capacity through enhanced oil recovery techniques.

Need help?

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs

Download the catalogue

Download our PDF catalog to get all the detail information related to this product category