Gas Distribution System

  • Routing design & calculation based on
    available spaces and forecast number of
    machines
  • Consumption calculation
  • Supply of all the components including
    cylinder racks, change-overs.
  • Installation including tubing welded through
    orbital welding machines

Typologies

Accessories

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Oil&Gas

NFE – North Field East – NFE LNG Project

A significant project aiming to extract and liquefy natural gas from Qatar’s North Field, one of the world’s largest natural gas reservoirs. The NFE project includes four new LNG trains, eight wellhead platforms, drilling 80 wells, and laying offshore pipelines. It enables the production of 32 million tons of LNG annually, along with ethane, condensate, LPG, and helium.

Bioenergy

Rotterdam Site Development Project

The production of renewable products began at the Rotterdam refinery in the Netherlands in 2011, marking a significant milestone in sustainability efforts. With Neste’s current capacity for renewable products standing at 1.4 million tons in Rotterdam, it currently holds the title for the largest such capacity in Europe. To further bolster its commitment to renewable energy, Neste is undertaking a substantial investment of approximately EUR 1.9 billion for the expansion of the Rotterdam refinery. This expansion project aims to increase overall renewable product capacity by 1.3 million tons per annum. Consequently, the total renewable product capacity in Rotterdam will soar to 2.7 million tons annually, with sustainable aviation fuel (SAF) production capability accounting for 1.2 million tons. The target timeline for starting up the new production unit is set for 2026.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs