Search

Explosion Proof Equipment

Spina Group manufactures and supplies explosion-proof equipment and accessories for industrial environments at risk of explosion. Electrical panels, junction boxes, cable glands, control stations, pipe unions, plugs and sockets, lighting fixtures are manufactured according to international standards such as UL, ATEX, NEC, IECEX to meet safety requirements in the industrial sector.

Products are manufactured according to the specifications provided by the customer. In the absence of specifications, Spina Group provides you with solutions suited to the field of application and to the regulatory standards in force.

Product tests and inspections are carried out in collaboration with the customer.

Our Offer

Junction Boxes

Industrial junction boxes, including GUB Enclosures, GRP Junction Boxes, stainless steel junction boxes, aluminum junction boxes, CCF Enclosures, instrument housings, and multiple-entry options, are designed to meet diverse application needs.

Local Control Stations

Spina Group provides multiple local control stations, circuit breakers, rotary and selector switches, electronic earthing control system.

Distribution Control Panels

Atex electrical panels meet international quality standards.

All the products comply with international and CEI standards and are manufactured by an internal design studio according to customer requirements.

In addition to the design of the panels, Spina offers a complete service that includes wiring, testing, packaging and shipping plus the technical documentation about the product and its functioning.

Plugs and Sockets

Interlocked sockets and plugs, Switched interlocked socket outlets IP66, and Plugs IP66 are designed to deliver reliable performance in demanding environments.

Cable Glands
Cable glands for armored and unarmored cables, complemented by shrouds, locknuts, and serrated washers, offer secure and efficient solutions for cable management.
Pipe Unions and Accessories

Spina Group provides pipe unions, pipe union fittings, stainless steel pipe unions, elbows, plugs, reducers, valves, conduits.

Latest successful projects

Bioenergy

Rotterdam Site Development Project

The production of renewable products began at the Rotterdam refinery in the Netherlands in 2011, marking a significant milestone in sustainability efforts. With Neste’s current capacity for renewable products standing at 1.4 million tons in Rotterdam, it currently holds the title for the largest such capacity in Europe. To further bolster its commitment to renewable energy, Neste is undertaking a substantial investment of approximately EUR 1.9 billion for the expansion of the Rotterdam refinery. This expansion project aims to increase overall renewable product capacity by 1.3 million tons per annum. Consequently, the total renewable product capacity in Rotterdam will soar to 2.7 million tons annually, with sustainable aviation fuel (SAF) production capability accounting for 1.2 million tons. The target timeline for starting up the new production unit is set for 2026.

Oil&Gas

Rumaila Project — ESP OHTL Ringmains Phase 1 — Area C

The Rumaila Project – ESP OHTL Ringmains is an Oil & Gas project developed within the Rumaila Oil Field, in southern Iraq. The project is part of the wider ESP Ring Main Project, aimed at developing ring-main electrical infrastructure and overhead transmission lines to power wells equipped with Electrical Submersible Pumps. Its objective is to provide stable power from the Rumaila Power Plant to the ESP wells, reducing the use of diesel generators, improving operational reliability and supporting the field’s long-term oil production.

Petrochemical

Project CERES

The Ceres Urea Plant, located on the coast of Western Australia, is a large onshore facility for the production of ammonia and urea from natural gas. Once completed, it will be the world’s largest gas-based ammonia and urea production plant. It uses local natural gas to produce fertilizers, integrating ammonia production, urea production, granulation, auxiliary services, port infrastructure and water supply facilities. The plant will include production areas, storage facilities and administrative functions. A 3.2 km conveyor belt will connect the plant to the port for the transport and loading of urea intended for export. The facility is designed to contribute to the target of achieving net-zero carbon emissions by 2050.

Need help?

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs

Download the catalogue

Download our PDF catalog to get all the detail information related to this product category