Search

Perforated and Closed-Bottom Cable Trays

Cable trays are used in the industrial plants to protect the laid cables. Specifically, the PS and AR perforated series are characterized by more lightness and by a good ventilation of the cable inside. The typology FC (closed bottom) is particularly suitable for environments where the cable isolation is essential.

Thermal expansion: Our joints with crossed slots allow an even greater deviation between the elements, recovering any possible expansion without damages.

Electrical continuity: The electrical continuity of the cable trays is guaranteed by the correct assembly of joints and/or the copper bonding jumper; for this purpose, properly marked grounding holes are made on the cable trays and cable tray accessories.

Typologies

Accessories

Among our perforated and closed-bottom cable trays, you will find:

  • Perforated simple flanges

  • Perforated bordered flanges

  • Closed bottom bordered flanges

  • Elbows (plane, inward, outward)

  • T derivations

  • Cross Elements

  • Reductions

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Energy

Taweelah RO Independent Water Project

The world’s largest sea water reverse osmosis desalination plant (RO), boasting a capacity of 200 MIGD (909,200 cubic meters of water per day). This plant surpasses the world’s current largest RO facility by 44% in terms of capacity. The Taweelah plant is poised to establish new benchmarks for water production efficiency and cost, thanks to its utilization of RO technology instead of thermal desalination.

Oil&Gas

Zohr Field Development Project

Zohr, an offshore gas field located in the Shorouk area of Egypt, represents the largest discovery of its kind in the Mediterranean. Identified using advanced offshore exploration techniques, this massive natural gas project lies approximately two hundred kilometers north of Port Said. With vast reserves, Zohr has the potential to meet Egypt’s energy demands for many years to come. Moreover, it positions the country to become a significant player in liquefied natural gas (LNG) exports within the Mediterranean region. The project required the implementation of cutting-edge technological solutions to develop infrastructure that adhered to strict timelines, budgets, and quality standards, from the initial exploration phase to production commencement.

Oil&Gas

Berri Oil Field Expansion

The Berri field, situated along the eastern coast of Saudi Arabia, is undergoing expansion through the Berri Increment Program (BIP) to increase its crude production capacity to 500,000 barrels per day (bpd). Initially discovered in 1964, the Berri field commenced crude oil production in 1970, with the Berri gas plant starting operations in 1977. Currently capable of producing 250,000 bpd of Arab Light crude, the field’s expansion program aims to double its crude production capacity through enhanced oil recovery techniques.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs