Search

Perforated and Closed-Bottom Cable Trays

Cable trays are used in the industrial plants to protect the laid cables. Specifically, the PS and AR perforated series are characterized by more lightness and by a good ventilation of the cable inside. The typology FC (closed bottom) is particularly suitable for environments where the cable isolation is essential.

Thermal expansion: Our joints with crossed slots allow an even greater deviation between the elements, recovering any possible expansion without damages.

Electrical continuity: The electrical continuity of the cable trays is guaranteed by the correct assembly of joints and/or the copper bonding jumper; for this purpose, properly marked grounding holes are made on the cable trays and cable tray accessories.

Typologies

Accessories

Among our perforated and closed-bottom cable trays, you will find:

  • Perforated simple flanges

  • Perforated bordered flanges

  • Closed bottom bordered flanges

  • Elbows (plane, inward, outward)

  • T derivations

  • Cross Elements

  • Reductions

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Western desert Gas Complex Train

The expansion of Western Desert Gas Complex (WDGC) is located in El-Amreya, Alexandria, Egypt. Once operational, the new Train D will increase WDGC’s production capacity to 1.5 bcfd, up from the current 950 MMcfd, with a capacity of 600 MMcfd. This expansion will not only boost the supply of ethane-propane mixture for Egyptian petrochemical producers but also increase WDGC’s production of LPG and condensates for the local market.

Oil&Gas

Salina Cruz Refinery Delayed Coker Furnaces

PEMEX is investing in constructing two new coker plants at the Tula refinery and Salina Cruz refinery, scheduled to go online in 2024, to phase out fuel oil production. The Salina Cruz cracking refinery, located in Oaxaca, Mexico, is a non-integrated cracking facility owned by Petroleos Mexicanos. It commenced operations in 1979 and boasts a Nelson Complexity Index (NCI) of 8.1. Works on the Salina Cruz unit began in 2022. The plant is expected to contribute to the elimination of fuel oil and the increased production of ultra-low sulfur gasoline and diesel at the refinery.

Oil&Gas

NFE – North Field East – NFE LNG Project

A significant project aiming to extract and liquefy natural gas from Qatar’s North Field, one of the world’s largest natural gas reservoirs. The NFE project includes four new LNG trains, eight wellhead platforms, drilling 80 wells, and laying offshore pipelines. It enables the production of 32 million tons of LNG annually, along with ethane, condensate, LPG, and helium.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs