Search

Local Control Stations

Spina Group provides multiple local control stations, circuit breakers, rotary and selector switches, electronic earthing control system.

Typologies

Accessories

Among our control stations, you will find:

  • Multiple control stations

  • Circuit Breakers

  • Rotary and selector switches

  • Electronic earthing control systems

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Petrochemical

Bouri Field

The Bouri Field is located offshore in Block NC-41, about 120km northwest of Tripoli in the waters of Libya. Water depth in the region ranges between 145m and 183m. Is estimated to contain 4.5 billion barrels (720,000,000 m3) in proven recoverable crude oil reserves and 3.5 trillion cubic feet (99 km3) of associated natural gas with an annual production potential of 6 billion m³. Bouri field development includes two offshore platforms- DP3 and DP4, seven subsea wells and an Floating Storage and Offloading (FSO). Bouri is considered the largest producing oilfield in the Mediterranean.

Petrochemical

PDH – Kallo Project

The upcoming propane dehydrogenation (PDH) plant is set to be a major player, aiming for a production capacity of 750,000 metric tonnes per year, positioning it among the world’s largest and most efficient facilities. It is situated at an existing Borealis production site in Kallo, Belgium, chosen for its strategic logistical location and extensive experience in propylene production. Additionally, the selection aims to capitalize on synergies with the existing PDH unit. Utilizing Honeywell UOP’s Oleflex™ technology, known for its reliability and sustainability in propylene production, underscores the plant’s commitment to efficient and eco-friendly operations.

Oil&Gas

North Safa Field Development Project

North Safa is an active conventional oil field situated in shallow waters off the coast of Egypt. Specifically located in the Northeast Ramadan Concession block, the field operates at a water depth of 217 feet. Anticipated to reach peak production by 2026, North Safa’s oil extraction will persist until it reaches its economic limit in 2041, as per economic projections.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs