Search

Brackets, Supports & Hardware

Spina Group designs and manufactures a complete range of cable trays brackets, supports, and hardware components to ensure fast, safe, and durable installation of cable management systems.

Our fixing hardware includes angle beams, steel brackets, and support plates engineered to guarantee excellent load capacity and resistance to vibration and corrosion. Each component is designed for compatibility with Spina Group cable trays and cable ladders, ensuring a consistent and modular installation.

The product line covers a full set of cable ladder fittings, including connectors, clamps, cover clamps, and expansion accessories, all designed to facilitate assembly and maintenance operations.

Manufactured in Hot-Dip Galvanised (HDG), stainless steel, or aluminium, our angle beam steel supports and fixing plates are suitable for industrial environments such as energy, process plants, and infrastructure projects.

Additional accessories such as protector rolls, collars, shelves, and mounting hardware complete the range, providing engineers and installers with a reliable and fully compatible system for every requirement.

Typologies

Accessories

Among our bolts, shelves and plates, you will find:

  • Beams
  • Brackets
  • Supports
  • Protector rolls
  • Plates
  • Collars
  • Clamps
  • Fixing Ardware

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Luanda Refinery

The expansion and modernization initiative aims to significantly increase the refinery’s petrol production capacity, quadrupling it to 450 thousand tonnes per year. As a part of this project, the Combined Cycle has been revamped to utilize hydrogen generated by the new Platforming unit. Additionally, energy production has been optimized by recycling gas, resulting in a notable reduction in polluting emissions.

Oil&Gas

Western desert Gas Complex Train

The expansion of Western Desert Gas Complex (WDGC) is located in El-Amreya, Alexandria, Egypt. Once operational, the new Train D will increase WDGC’s production capacity to 1.5 bcfd, up from the current 950 MMcfd, with a capacity of 600 MMcfd. This expansion will not only boost the supply of ethane-propane mixture for Egyptian petrochemical producers but also increase WDGC’s production of LPG and condensates for the local market.

Energy

New Hydrogen Production Unit – Porto Marghera

The project aims at implementing two hydrogen production lines for the Venice biorefinery in Porto Marghera. Its primary objective is to increase the availability of hydrogen at the biorefinery to fulfill the requirements of the EcofiningTM unit in terms of quality, quantity, and availability, all while optimizing energy efficiency. As part of a phased transition to producing decarbonized hydrogen, these units are designed to significantly reduce the emission of fossil CO2 into the atmosphere by utilizing biogenic charges recirculated by the EcofiningTM unit.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs