Search

Brackets, Supports & Hardware

Spina Group designs and manufactures a complete range of cable trays brackets, supports, and hardware components to ensure fast, safe, and durable installation of cable management systems.

Our fixing hardware includes angle beams, steel brackets, and support plates engineered to guarantee excellent load capacity and resistance to vibration and corrosion. Each component is designed for compatibility with Spina Group cable trays and cable ladders, ensuring a consistent and modular installation.

The product line covers a full set of cable ladder fittings, including connectors, clamps, cover clamps, and expansion accessories, all designed to facilitate assembly and maintenance operations.

Manufactured in Hot-Dip Galvanised (HDG), stainless steel, or aluminium, our angle beam steel supports and fixing plates are suitable for industrial environments such as energy, process plants, and infrastructure projects.

Additional accessories such as protector rolls, collars, shelves, and mounting hardware complete the range, providing engineers and installers with a reliable and fully compatible system for every requirement.

Typologies

Accessories

Among our bolts, shelves and plates, you will find:

  • Beams
  • Brackets
  • Supports
  • Protector rolls
  • Plates
  • Collars
  • Clamps
  • Fixing Ardware

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Oil&Gas

Berri Oil Field Expansion

The Berri field, situated along the eastern coast of Saudi Arabia, is undergoing expansion through the Berri Increment Program (BIP) to increase its crude production capacity to 500,000 barrels per day (bpd). Initially discovered in 1964, the Berri field commenced crude oil production in 1970, with the Berri gas plant starting operations in 1977. Currently capable of producing 250,000 bpd of Arab Light crude, the field’s expansion program aims to double its crude production capacity through enhanced oil recovery techniques.

Oil&Gas

Baltic Pipe Project – Compressor Station in Everdrup

The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark. The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs