Search

Cable Ladders

Spina Group designs and manufactures cable ladders for industrial and infrastructure projects requiring reliable and ventilated support systems for electrical and instrumentation cables.

Each ladder tray combines high mechanical resistance and maximum ventilation, ensuring safe cable routing even in high-temperature environments. Thanks to their open structure, ladder cable trays are ideal for heavy-duty industrial applications where fast installation and accessibility are key.

Our cable ladder systems are available in Hot-Dip Galvanised (HDG) and stainless steel, with optional aluminium ladder trays for lightweight or corrosion-sensitive environments. Every model ensures full compatibility with Spina Group accessories and conforms to EN and UL standards.

Standard widths include 300mm ladder trays and larger custom sizes, offering flexibility for both compact and large-scale installations.

Accessories such as elbows, junctions, supports, and fixing systems guarantee complete modularity and safe installation in any industrial setting.

Typologies

Accessories

Among our cable ladders, you will find:

  • Cable ladders

  • Elbows (plane, inward, outward)

  • T derivations

  • Cross elements, reductions and fastening plates

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Bioenergy

Rotterdam Site Development Project

The production of renewable products began at the Rotterdam refinery in the Netherlands in 2011, marking a significant milestone in sustainability efforts. With Neste’s current capacity for renewable products standing at 1.4 million tons in Rotterdam, it currently holds the title for the largest such capacity in Europe. To further bolster its commitment to renewable energy, Neste is undertaking a substantial investment of approximately EUR 1.9 billion for the expansion of the Rotterdam refinery. This expansion project aims to increase overall renewable product capacity by 1.3 million tons per annum. Consequently, the total renewable product capacity in Rotterdam will soar to 2.7 million tons annually, with sustainable aviation fuel (SAF) production capability accounting for 1.2 million tons. The target timeline for starting up the new production unit is set for 2026.

Oil&Gas

North Safa Field Development Project

North Safa is an active conventional oil field situated in shallow waters off the coast of Egypt. Specifically located in the Northeast Ramadan Concession block, the field operates at a water depth of 217 feet. Anticipated to reach peak production by 2026, North Safa’s oil extraction will persist until it reaches its economic limit in 2041, as per economic projections.

Petrochemical

Bouri Field

The Bouri Field is located offshore in Block NC-41, about 120km northwest of Tripoli in the waters of Libya. Water depth in the region ranges between 145m and 183m. Is estimated to contain 4.5 billion barrels (720,000,000 m3) in proven recoverable crude oil reserves and 3.5 trillion cubic feet (99 km3) of associated natural gas with an annual production potential of 6 billion m³. Bouri field development includes two offshore platforms- DP3 and DP4, seven subsea wells and an Floating Storage and Offloading (FSO). Bouri is considered the largest producing oilfield in the Mediterranean.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs