Search

Cable Ladders

Cable ladders are designed to support high linear loads and to permit a higher ventilation in order to mantain a constant cable temperature inside, even with cable tray covers. For this reason, cable ladders are mainly suitable for energy cables installations.

Thermal Expansion of cable ladder parts: Our joints with crossed slots allow an even greater deviation between the elements, recovering any possible expansion without damages.

Electrical Continuity: The electrical continuity of ladder cable trays is guaranteed by the correct assembly of joints and/or the copper bonding jumper; for this purpose, properly marked grounding holes are made on the cable trays and related accessories.

Typologies

Accessories

Among our cable ladders, you will find:

  • Cable ladders

  • Elbows (plane, inward, outward)

  • T derivations

  • Cross elements, reductions and fastening plates

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Salina Cruz Refinery Delayed Coker Furnaces

PEMEX is investing in constructing two new coker plants at the Tula refinery and Salina Cruz refinery, scheduled to go online in 2024, to phase out fuel oil production. The Salina Cruz cracking refinery, located in Oaxaca, Mexico, is a non-integrated cracking facility owned by Petroleos Mexicanos. It commenced operations in 1979 and boasts a Nelson Complexity Index (NCI) of 8.1. Works on the Salina Cruz unit began in 2022. The plant is expected to contribute to the elimination of fuel oil and the increased production of ultra-low sulfur gasoline and diesel at the refinery.

Bioenergy

Rotterdam Site Development Project

The production of renewable products began at the Rotterdam refinery in the Netherlands in 2011, marking a significant milestone in sustainability efforts. With Neste’s current capacity for renewable products standing at 1.4 million tons in Rotterdam, it currently holds the title for the largest such capacity in Europe. To further bolster its commitment to renewable energy, Neste is undertaking a substantial investment of approximately EUR 1.9 billion for the expansion of the Rotterdam refinery. This expansion project aims to increase overall renewable product capacity by 1.3 million tons per annum. Consequently, the total renewable product capacity in Rotterdam will soar to 2.7 million tons annually, with sustainable aviation fuel (SAF) production capability accounting for 1.2 million tons. The target timeline for starting up the new production unit is set for 2026.
Alba Project

Petrochemical

ALBA Project – PP and PEL plants

The project consists of two plants: one for producing linear polyethylene (PEL) and another for producing polypropylene (PP), each with an annual production capacity of 300,000 tons. Both plants utilize cutting-edge technologies that ensure top energy efficiency. These technologies are leading in the market and are the first of their kind to be implemented on the Iberian Peninsula.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs