Search

Local Control Stations

Spina Group provides multiple local control stations, circuit breakers, rotary and selector switches, electronic earthing control system.

Typologies

Accessories

Among our control stations, you will find:

  • Multiple control stations

  • Circuit Breakers

  • Rotary and selector switches

  • Electronic earthing control systems

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Baltic Pipe Project – Compressor Station in Everdrup

The project aimed at the installation of piping and equipment of the Everdup Process Plant gas compression station, part of the Baltic Pipe project in Denmark. The Baltic Pipe is a strategic infrastructure project that aims to create a new gas supply corridor in the European market. Operational since October 2022, the Baltic Pipe is 900km long for a total cost of 1.88 billion dollars: it connects the Norwegian gas transport system with Denmark and Poland via an underwater gas pipeline in the North Sea.

Oil&Gas

Zohr Field Development Project

Zohr, an offshore gas field located in the Shorouk area of Egypt, represents the largest discovery of its kind in the Mediterranean. Identified using advanced offshore exploration techniques, this massive natural gas project lies approximately two hundred kilometers north of Port Said. With vast reserves, Zohr has the potential to meet Egypt’s energy demands for many years to come. Moreover, it positions the country to become a significant player in liquefied natural gas (LNG) exports within the Mediterranean region. The project required the implementation of cutting-edge technological solutions to develop infrastructure that adhered to strict timelines, budgets, and quality standards, from the initial exploration phase to production commencement.

Oil&Gas

Assiut Hydrocracking Complex

The Assiut oil refinery in Egypt is undergoing a significant expansion and modernization effort to meet the rising demand for petroleum products in Upper Egypt. As part of the refinery upgrade, new facilities including a naphtha complex and a hydrocracking complex will be added. This expansion and modernization initiative will further boost the refining capacity of the existing refinery. Presently, the refinery processes 4.5 million tonnes per annum (Mtpa) of distillation crude.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs