Search

Local Control Stations

Spina Group provides multiple local control stations, circuit breakers, rotary and selector switches, electronic earthing control system.

Typologies

Accessories

Among our control stations, you will find:

  • Multiple control stations

  • Circuit Breakers

  • Rotary and selector switches

  • Electronic earthing control systems

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Assiut Hydrocracking Complex

The Assiut oil refinery in Egypt is undergoing a significant expansion and modernization effort to meet the rising demand for petroleum products in Upper Egypt. As part of the refinery upgrade, new facilities including a naphtha complex and a hydrocracking complex will be added. This expansion and modernization initiative will further boost the refining capacity of the existing refinery. Presently, the refinery processes 4.5 million tonnes per annum (Mtpa) of distillation crude.

Energy

Taweelah RO Independent Water Project

The world’s largest sea water reverse osmosis desalination plant (RO), boasting a capacity of 200 MIGD (909,200 cubic meters of water per day). This plant surpasses the world’s current largest RO facility by 44% in terms of capacity. The Taweelah plant is poised to establish new benchmarks for water production efficiency and cost, thanks to its utilization of RO technology instead of thermal desalination.

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs