Search

Brackets, Supports & Hardware

Spina Group designs and manufactures a complete range of cable trays brackets, supports, and hardware components to ensure fast, safe, and durable installation of cable management systems.

Our fixing hardware includes angle beams, steel brackets, and support plates engineered to guarantee excellent load capacity and resistance to vibration and corrosion. Each component is designed for compatibility with Spina Group cable trays and cable ladders, ensuring a consistent and modular installation.

The product line covers a full set of cable ladder fittings, including connectors, clamps, cover clamps, and expansion accessories, all designed to facilitate assembly and maintenance operations.

Manufactured in Hot-Dip Galvanised (HDG), stainless steel, or aluminium, our angle beam steel supports and fixing plates are suitable for industrial environments such as energy, process plants, and infrastructure projects.

Additional accessories such as protector rolls, collars, shelves, and mounting hardware complete the range, providing engineers and installers with a reliable and fully compatible system for every requirement.

Typologies

Accessories

Among our bolts, shelves and plates, you will find:

  • Beams
  • Brackets
  • Supports
  • Protector rolls
  • Plates
  • Collars
  • Clamps
  • Fixing Ardware

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

JGTP Capacity Enhancement Project

The JGTP Capacity Enhancement Project is an expansion and upgrading project for the Jordan Gas Transmission Pipeline, aimed at increasing transmission capacity to meet growing domestic demand and support regional gas trade. The project includes pipeline upgrades and the addition of compressor facilities to allow the system to operate at higher pressures and transport larger gas volumes. The Jordan Gas Transmission Pipeline has a 36-inch (914 mm) diameter and an ultimate transmission capacity of approximately 10 billion cubic metres (bcm) of natural gas per year.

Oil&Gas

FDS2

Saipem FDS 2 is a DP3 field development vessel designed for ultra-deepwater subsea construction. Operating primarily in J-lay mode, it is capable of installing rigid pipelines up to 36 inches in diameter, as well as subsea structures, umbilicals and flexible flowlines. Equipped with a 2,000-tonne J-lay tower, a 1,000-tonne offshore crane, a DP3 dynamic positioning system and automated welding systems, FDS 2 delivers high-precision and efficient installation for complex offshore field development projects.

Energy

New Hydrogen Production Unit – Porto Marghera

The project aims at implementing two hydrogen production lines for the Venice biorefinery in Porto Marghera. Its primary objective is to increase the availability of hydrogen at the biorefinery to fulfill the requirements of the EcofiningTM unit in terms of quality, quantity, and availability, all while optimizing energy efficiency. As part of a phased transition to producing decarbonized hydrogen, these units are designed to significantly reduce the emission of fossil CO2 into the atmosphere by utilizing biogenic charges recirculated by the EcofiningTM unit.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs