Search

Brackets, Supports & Hardware

Spina Group designs and manufactures a complete range of cable trays brackets, supports, and hardware components to ensure fast, safe, and durable installation of cable management systems.

Our fixing hardware includes angle beams, steel brackets, and support plates engineered to guarantee excellent load capacity and resistance to vibration and corrosion. Each component is designed for compatibility with Spina Group cable trays and cable ladders, ensuring a consistent and modular installation.

The product line covers a full set of cable ladder fittings, including connectors, clamps, cover clamps, and expansion accessories, all designed to facilitate assembly and maintenance operations.

Manufactured in Hot-Dip Galvanised (HDG), stainless steel, or aluminium, our angle beam steel supports and fixing plates are suitable for industrial environments such as energy, process plants, and infrastructure projects.

Additional accessories such as protector rolls, collars, shelves, and mounting hardware complete the range, providing engineers and installers with a reliable and fully compatible system for every requirement.

Typologies

Accessories

Among our bolts, shelves and plates, you will find:

  • Beams
  • Brackets
  • Supports
  • Protector rolls
  • Plates
  • Collars
  • Clamps
  • Fixing Ardware

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

North Safa Field Development Project

North Safa is an active conventional oil field situated in shallow waters off the coast of Egypt. Specifically located in the Northeast Ramadan Concession block, the field operates at a water depth of 217 feet. Anticipated to reach peak production by 2026, North Safa’s oil extraction will persist until it reaches its economic limit in 2041, as per economic projections.

Oil&Gas

Coral South Project

At the center of the project, Coral Sul FLNG: a floating plant for the liquefaction of natural gas. The ship is 432 meters long and weighs 200 thousand tons. It also has a gas liquefaction capacity of 3.4 million tons per year and will produce LNG from the 500 billion cubic meters of gas from the Coral field. This historic project will help increase the availability of gas on the global market and is an important lever of Mozambique economic and social development.

Oil&Gas

Salina Cruz Refinery Delayed Coker Furnaces

PEMEX is investing in constructing two new coker plants at the Tula refinery and Salina Cruz refinery, scheduled to go online in 2024, to phase out fuel oil production. The Salina Cruz cracking refinery, located in Oaxaca, Mexico, is a non-integrated cracking facility owned by Petroleos Mexicanos. It commenced operations in 1979 and boasts a Nelson Complexity Index (NCI) of 8.1. Works on the Salina Cruz unit began in 2022. The plant is expected to contribute to the elimination of fuel oil and the increased production of ultra-low sulfur gasoline and diesel at the refinery.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs