Search

Pipe Unions and Accessories

Spina Group provides pipe unions, pipe union fittings, stainless steel pipe unions, elbows, plugs, reducers, valves, conduits.

Typologies

Accessories

Among our pipe unions and accessories, you will find:

  • Fittings
  • Elbows
  • Unions
  • Plugs
  • Reducers
  • Flexible
  • Conduits

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Petrochemical

Bouri Field

The Bouri Field is located offshore in Block NC-41, about 120km northwest of Tripoli in the waters of Libya. Water depth in the region ranges between 145m and 183m. Is estimated to contain 4.5 billion barrels (720,000,000 m3) in proven recoverable crude oil reserves and 3.5 trillion cubic feet (99 km3) of associated natural gas with an annual production potential of 6 billion m³. Bouri field development includes two offshore platforms- DP3 and DP4, seven subsea wells and an Floating Storage and Offloading (FSO). Bouri is considered the largest producing oilfield in the Mediterranean.

Oil&Gas

Duqm Refinery Project

Expected to possess a capacity of 230,000 barrels per day, the DUQM Refinery is an integrated project of national significance situated within the Special Economic Zone of Duqm (SEZAD). The 230,000 BPD Duqm Refinery stands as a crucial endeavor for the advancement of Duqm, the Al Wusta Governorate, and the broader Omani economy. With the goal of establishing one of the Middle East’s premier ports in the Duqm region, the Sultanate of Oman aims to capitalize on its strategic location along the Arabian Sea. Within this framework, this project serves as the primary driving force and facilitator for the subsequent development of a significant new commercial, residential, and touristic area in Oman.

Oil&Gas

Garraf Field – Gas Dehydration Plant

Situated in the Thi Qar province, approximately 5km northwest of Al-Refaei city and 85km north of Nasiriya, the Garraf oil field has an onshore location. Discovered in 1984, this oil field contains oil reserves within Cretaceous reservoirs. Spanning 17.5km in length and 5.5km in width, it is estimated to harbor 1.3 billion barrels of oil. Upon reaching full production, the field’s production capacity is projected to escalate to 230,000 barrels of oil per day (bopd). Transportation of the oil field’s products is facilitated through a 13km pipeline to the Gharraf-Badra tie-in area (GBTA). Subsequently, it is conveyed via a 28-inch, 92km pipeline to the Nassiriyah storage depot.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs