Search

Cable Glands

Cable glands for armored and unarmored cables, complemented by shrouds, locknuts, and serrated washers, offer secure and efficient solutions for cable management.

Typologies

Accessories

Among our cable glands, you will find:

  • Cable glands for unarmored cables

  • Cable glands for armored cables

  • Shrouds

  • Locknuts

  • Serrated washers

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

Tortue Development Project – Phase 1

An offshore project based on gas production in deep waters up to 2 km off the maritime border between Mauritania and Senegal. It is currently the deepest offshore project in Africa. Planned in phases, the Greater Tortue Ahmeyim LNG project will produce up to 10 million tonnes of LNG per year (Mtpa). A new drilling called Greater Tortue Ahmeyim-1 was carried out to a total depth of 4,884 meters in the eastern part of the Greater Tortue area, discovering 30 meters of net gas in a high-quality Albian reservoir in July 2019. This new discovery indicates the potential to expand the capacity of the LNG project beyond 10 Mtpa in the future.

Oil&Gas

NFE – North Field East – NFE LNG Project

A significant project aiming to extract and liquefy natural gas from Qatar’s North Field, one of the world’s largest natural gas reservoirs. The NFE project includes four new LNG trains, eight wellhead platforms, drilling 80 wells, and laying offshore pipelines. It enables the production of 32 million tons of LNG annually, along with ethane, condensate, LPG, and helium.

Oil&Gas

Petrobrazi Refinery

Petrobrazi, boasting an annual refining capacity of 4.5 million tons/year of crude oil, stands as one of Romania’s foremost refineries. It serves as a pivotal hub where crude oil undergoes processing, resulting in a diverse array of high-value petroleum products, ranging from gasoline and diesel to LPG and aviation fuel. Presently, Petrobrazi operates at exemplary environmental and performance standards, capable of refining the entire equity crude oil production of OMV Petrom. In a strategic move towards sustainability, the Romanian oil company plans to construct 55MW of green hydrogen projects at its Petrobrazi refinery, located 60km north of Bucharest. This initiative involves the installation of two electrolysers, one with a capacity of 35MW and the other with 20MW. The renewable hydrogen generated will be utilized in the production of bio-based sustainable aviation fuel (SAF) and biodiesel, marking a significant step towards reducing carbon emissions in the aviation sector.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs