Search

Junction Boxes

Industrial junction boxes, including GUB Enclosures, GRP Junction Boxes, stainless steel junction boxes, aluminum junction boxes, CCF Enclosures, instrument housings, and multiple-entry options, are designed to meet diverse application needs.

Typologies

Accessories

Among our junction boxes, you will find:

  • GRP Junction boxes – JBPN

  • Stainless Steel junction boxes - JBXN

  • Aluminum junction boxes - JBAL

  • Enclosures for control units series CCF

  • Enclosures for control units series GUB

Our catalogue

Discover all our innovative solutions in one comprehensive catalogue.

PROJECTS

Our Successful Projects

Oil&Gas

AIN TSILA GAS FIELD DEVELOPMENT

Ain Tsila is a gas condensate field situated in the Illizi Basin, Algeria, located within the Isarene permit in Blocks 228 and 229a. The Ain Tsila field boasts reserves amounting to 2.1 trillion cubic feet of sales gas, alongside 67 million barrels of condensate and 108 million barrels of liquefied petroleum gas (LPG). Discovered in 2009 through the successful drilling of the Ain Tsila-1 well, this gas condensate field garnered significant recognition, ranking as the ninth-largest discovery globally for that year. Spanning an extensive area exceeding 1,000 square kilometers, Ain Tsila represents a substantial addition to the energy landscape.

Oil&Gas

Salina Cruz Refinery Delayed Coker Furnaces

PEMEX is investing in constructing two new coker plants at the Tula refinery and Salina Cruz refinery, scheduled to go online in 2024, to phase out fuel oil production. The Salina Cruz cracking refinery, located in Oaxaca, Mexico, is a non-integrated cracking facility owned by Petroleos Mexicanos. It commenced operations in 1979 and boasts a Nelson Complexity Index (NCI) of 8.1. Works on the Salina Cruz unit began in 2022. The plant is expected to contribute to the elimination of fuel oil and the increased production of ultra-low sulfur gasoline and diesel at the refinery.

Oil&Gas

Quiluma and Maboqueiro

The project involves the development of the Quiluma and Maboqueiro non-associated gas fields through two offshore platforms, pipeline connections and an onshore gas treatment plant designed to feed the Angola LNG plant in Soyo. Its objective is to enhance the value of Angola’s natural gas resources, ensure a stable gas supply to the LNG plant and strengthen the national energy value chain.

Get in touch

Do you have a question or need specific information? 
Write to us and we can best advise you.

Request a quote

Our technicians will be able to support you in analyzing all your needs and identifying the most suitable product for your needs